Skip to content
You can now search across every topic, entity and event.What's new
European Tech Sovereignty
26JUL

Gulf producers build around the strait

3 min read
10:21UTC

Kuwait said it would raise production as Iraq's Kirkuk-Ceyhan and Saudi Arabia's Yanbu East-West pipelines moved roughly 9 million barrels a day around Hormuz, against the strait's normal 20 million.

TechnologyDeveloping
Key takeaway

Gulf pipelines route about 9 million barrels a day around Hormuz, under half the strait's normal flow.

Kuwait said it would begin increasing production, and Gulf exporters drew on pipeline routes that skirt the strait of Hormuz entirely: Iraq's Kirkuk-Ceyhan line to Turkey's Mediterranean coast and Saudi Arabia's Yanbu East-West line to the Red Sea 1. Both run crude out to open water without touching the waterway the IRGC has formally declared closed.

The two pipelines carry roughly 9 million barrels a day between them, against the strait's normal 20 million 2. Producers can route under half their oil around Iran's leverage, which is why a closure threat still bites even as the workaround keeps prices calm: the alternatives soften the chokepoint without replacing it.

Three Saudi very large crude carriers reactivated their transponders off Oman on 19 June, the first confirmed commercial crossings since the closure declaration 3. Days earlier those same ships had only been positioned near Hormuz, not transiting ; by 22 June they were moving cargo across the closure line itself, turning a structural hedge for Riyadh and Baghdad into a live one.

Deep Analysis

In plain English

While Iran claims to have closed the Strait of Hormuz, Gulf oil producers have been routing crude through two alternative pipelines that avoid it entirely. One runs from Iraq's Kirkuk oilfields north to Turkey's Mediterranean coast; the other crosses Saudi Arabia from east to west, ending at the Red Sea port of Yanbu. Together these carry roughly 9 million barrels a day. The problem is that this is less than half of what normally goes through Hormuz (about 20 million barrels a day). So the world can get some oil out of the Gulf via these pipelines, but not nearly enough to replace what would normally flow through the strait. That is one reason energy prices remain elevated even as they fall from their peak.

What could happen next?
  • Consequence

    The 9 million barrels per day pipeline ceiling means Asian refiners dependent on Gulf crude face a persistent supply gap until the Oman corridor delivers full restoration; Kuwait's production increase partially offsets this but at reduced margin given sub-$80 Brent.

  • Precedent

    Saudi Aramco's resumption of VLCC transits through the Oman corridor, using AIS transparency rather than dark shipping, establishes a Gulf-producer norm for Hormuz reopening: producers will transit when the route is physically safe, regardless of IRGC declaration status.

First Reported In

Update #135 · Trump's threats peak, his paper stays blank

Wikipedia / Kpler· 22 Jun 2026
Read original
Different Perspectives
China's Ministry of Commerce
China's Ministry of Commerce
Spokesperson He Yadong said on 16 July that Beijing and the Netherlands should let firms settle the Nexperia dispute through consultation, after a Dutch ministerial visit to Beijing. The conciliatory tone contrasts with the confrontational US trade response to the same fortnight's DMA enforcement.
Samsung Electronics
Samsung Electronics
Samsung entered talks reported 22 July to invest up to €1 billion in Mistral AI, part of a round valuing the French lab at roughly €20 billion alongside EQT, Novo Holdings and Santander. The Korean conglomerate, not an EU financing instrument, is positioned to anchor Europe's flagship AI lab.
Poland (Tusk government)
Poland (Tusk government)
Donald Tusk's government proposed a mandatory sovereignty test on 21 July for state technology contracts above 5 million zloty, scoring bids on AI model-weight rights and vendor lock-in rather than waiting for an EU-wide procurement rule. The threshold targets a 20-30 per cent domestic-alternative share.
United States administration
United States administration
Donald Trump ordered a Section 301 investigation into EU digital-enforcement practices on 24 July, a day after USTR's Jamieson Greer said the Google fine created massive uncertainty for US exports, noting Google's cumulative EU fines already exceed 2 per cent of the bloc's budget.
Ecosia
Ecosia
Ecosia said the 16 July FRAND ranking-data order would take it from answering two-thirds of queries to all of them once the obligation activates in January 2027. The Berlin-based challenger has not called the enforcement package adequate, only workable if Google complies rather than appeals.
European Commission
European Commission
Teresa Ribera and Henna Virkkunen announced the €890m fine on 23 July, saying products should succeed on merit, not platform ownership; four days earlier a separate Article 6(7) order compelled Android interoperability. The Commission expects both to hold on appeal after the Court of Justice upheld its earlier €4.1bn Android fine on 2 July.