Skip to content
You can now search across every topic, entity and event.What's new
European Energy Markets
18JUN

OFAC quietly extends Russia crude waiver

4 min read
09:57UTC

OFAC issued General License 134B on 17 April, one day after Bessent killed GL 134A, keeping pre-loaded Russia-origin crude legal through 16 May at roughly $150 million a day.

EconomicDeveloping
Key takeaway

Treasury's 16 April announcement looked like a kill; the 17 April licence kept Russian cargoes flowing for another month.

The Office of Foreign Assets Control (OFAC) issued General License 134B on 17 April 2026, one day after Treasury Secretary Scott Bessent announced the non-renewal of GL 134A and the redesignation of Rosneft and Lukoil as Specially Designated Nationals . GL 134B authorises continued transactions in Russia-origin crude oil and petroleum products loaded onto vessels by 12:01 a.m. EDT on 17 April, with the authorisation valid through 12:01 a.m. EDT on 16 May 2026. Ancillary services covered include docking, bunkering, emergency repairs and maritime insurance. The licence carves out any cargo touching Iran, North Korea, Cuba, Crimea, Donetsk or Luhansk-linked entities, which remain under their separate sanctions architecture.

GL 134A had run since November 2025 and was scheduled to expire on 11 April . Bessent's 16 April statement was read by wires including Reuters and Semafor as a hard kill of the at-sea cargo channel. The licence Treasury's own sanctions desk signed the next day kept that channel running for any cargo already on the water. The real cliff is 16 May, not 11 April.

At Urals $106.81/bbl in early May, every day of legal at-sea liquidation translates to roughly $150 million in cargoes Moscow's shadow fleet can sell with insurance and port access. The four-week extension therefore covers cargoes worth roughly $4.5bn that the 16 April press release had implied were stranded.

The instrument resembles the 2022 price-cap architecture more than the 2014 Crimea designations: a cliff-extension licence designed to prevent disorderly liquidation rather than to reduce Russian revenue immediately. At $121/bbl, an at-sea waiver would subsidise Moscow at 2.6 times the price-cap design rate ; at $106 the multiple is lower but the legal-cargo flow is unbroken. The press-release moment moved one direction. The licence moved the other.

Deep Analysis

In plain English

OFAC, the US Treasury's sanctions office, quietly issued a new licence on 17 April 2026, one day after Treasury Secretary Bessent announced that an earlier licence allowing Russia to sell oil had not been renewed. The new licence, called General License 134B, allows Russian oil that was already loaded onto ships before 17 April to continue being sold until 16 May. In plain terms: Bessent's announcement sounded like a hard stop. The licence issued the next day kept Russian oil revenues flowing for another month. The difference between the two is worth roughly $4.5 billion to Moscow over the four-week window.

Deep Analysis
Root Causes

The structural cause of the GL 134A-to-134B gap is the shadow fleet architecture that Russia built between 2022 and 2025. Approximately 300 to 400 tankers operating outside Western insurance frameworks loaded Russian crude in the weeks before GL 134A's 11 April expiry, knowing a non-renewal announcement was possible.

Those tankers were at sea when the Bessent statement dropped. OFAC's operational constraint was straightforward: it could not simultaneously enforce a hard cut-off and avoid stranding hundreds of laden tankers in international waters without clear port destinations, which would have created a humanitarian and environmental liability larger than the revenue denial.

The second structural cause is the $106/bbl Urals price environment. GL 134A was defensible at $73/bbl as a market-stabilisation measure issued during the Iran war's early supply shock. At $106/bbl the waiver is worth approximately $150 million per day to Moscow, and the political cost of each extension day has risen proportionally.

OFAC's 16 May hard cliff reflects an internal Treasury assessment that the at-sea cargo can realistically clear port by that date at current shipping speeds, making a GL 134C issuance operationally unnecessary.

What could happen next?
  • Consequence

    GL 134B establishes a precedent that OFAC will issue a same-day extension whenever a publicly announced sanctions cliff would strand at-sea cargo at scale, creating a structural market expectation of rolling extensions.

    Immediate · 0.82
  • Risk

    If OFAC issues GL 134C before 16 May at above-$100/bbl Urals, the credibility of all future Treasury sanctions announcements on Russian crude is materially reduced, affecting allied governments' willingness to coordinate.

    Short term · 0.75
  • Consequence

    Russia's RNRC capitalisation gap means Moscow has a structural interest in another OFAC extension after 16 May; without it, the shadow fleet faces underinsured voyages or Chinese P&I cover at higher cost.

    Medium term · 0.72
First Reported In

Update #15 · Hardware-free parade; crude waiver lives on

Baker McKenzie Sanctions News· 3 May 2026
Read original
Different Perspectives
Cross-border power traders
Cross-border power traders
The France-Germany day-ahead spread flipped from a EUR 17.20 German premium on 1 August to a EUR 4.15 French premium on 3 August, the same day French curtailment peaked. They cannot yet attribute the flip to curtailment alone, since a like-for-like overnight comparison shows French nuclear output rising while wind fell and demand returned on the weekday step.
EDF
EDF
River-cooling limits took 7.6 GW, 12 per cent of its fleet, offline on 3 August, the highest curtailment since the heatwave began, with an easing forecast to 4.3 GW on 4 August and 3 GW after. It manages the cut as a recurring seasonal constraint, expecting it to lift with river temperature, not repair.
Gasunie
Gasunie
TTF, the Dutch hub it operates, drifted to roughly EUR 55 to 58 per MWh across the window, staying inside its recent range through both the German spark reversal and the French curtailment. It reads a flat hub price as evidence that neither event this window carried enough weight to move the fuel leg on its own.
German gas-fired generators
German gas-fired generators
Record German solar of 18,761 MW on 2 August pushed the clean spark spread to minus 18.48 EUR/MWh, a loss-making day, before it returned to plus 16.20 on 3 August. They now price dispatch against post-solar residual load rather than wind alone, since the sign flipped inside 48 hours on unchanged fuel and carbon costs.
European Commission (DG Energy)
European Commission (DG Energy)
Its implementing-measures register logged transposition notices from only Portugal and Slovakia against Wednesday's Article 94 deadline for Directive (EU) 2024/1788, with 25 states silent. It expects the register to fill only gradually, since filing routinely lags legislating and any infringement track against non-notifying states runs on a slower clock than the deadline itself.
Spain's LNG terminal operators
Spain's LNG terminal operators
Spain's 9,145 GWh terminal inventory is the largest single stock in the EU LNG network, an option value that can reroute cargoes wherever the winter strip pays best rather than a cavern gas obligation tied to a fixed date. That flexibility matters more as Germany's cavern shortfall pushes more of the winter security question onto import infrastructure.