Skip to content
You can now search across every topic, entity and event.What's new
European Energy Markets
18JUN

Iran demands $12bn freed before Hormuz

4 min read
09:57UTC

Iran told mediators on Sunday it wants $12bn frozen in Qatar released before it reopens Hormuz or moves on nuclear questions. Washington wants the strait open first. Neither will move first.

EconomicDeveloping
Key takeaway

Both sides agree on the deal's shape but not on who acts first, and that gap holds.

On Sunday 24 May, Iran told mediators it wants $12bn in Iranian assets frozen in Qatar released before any reopening of the Strait of Hormuz or steps on its nuclear programme, relayed via Iran International citing the IRGC-aligned outlet Tasnim 1. Tehran said it would not let asset release be handed to "vague and illusory promises." Washington's counter runs the other way: the cash unfreezes only after Hormuz reopens.

This one clause blocks an agreement whose broad principles both sides say are settled. Donald Trump had cast the deal as all but done , and accounts of its terms had varied between the parties ; the $12bn demand is the concrete obstacle those optimistic readings had glossed over. Iran's Foreign Ministry put it plainly through spokesman Esmaeil Baghaei: the two sides had reached agreement on "a large portion of the issues," but "an agreement is not imminent" 2.

Tehran and Washington divide over the order of operations rather than the principle. Since the US left the 2015 nuclear deal in 2018, Tehran has treated American commitments as reversible, so it will not surrender an operational lever like the strait before the money lands. Washington will not release $12bn it cannot claw back before seeing a concession it can verify. Each side asks the other to move first.

That is the same failure mode that stalled arms-control talks through the 1980s: agreement on the ends, deadlock on the verifiable order of concessions. It also explains how a deal can be described as close and stuck at once. The futures market is pricing the sequence resolving soon; the posture on the ground has not changed. The demand itself is sourced to Iranian state-adjacent media, so the precise figure carries Tehran's framing, though US-official accounts corroborate that a sequencing gap is what remains.

Deep Analysis

In plain English

Iran has told the negotiators trying to end the war that before it agrees to reopen the Strait of Hormuz, it wants $12 billion of its own money back. The US Treasury froze those funds years ago through sanctions. The US says Iran has to open the strait first, then the money gets released. Iran refuses: it made concessions in the 2015 nuclear deal and received nothing when the US cancelled that deal in 2018. Tehran's foreign ministry spokesman Esmaeil Baghaei confirmed on 25 May that a deal is not imminent because of this standoff over which side moves first.

Deep Analysis
Root Causes

The sequencing deadlock has one structural cause: neither party has a credible commitment mechanism. The US cannot sign a treaty without Senate ratification (impossible in the current political configuration), and executive orders can be revoked by the same president who signed them within 24 hours. Iran's side cannot credibly commit to Hormuz reopening without IRGC commander endorsement, which requires Khamenei Council sign-off that has not been publicly confirmed.

The $12bn demand operationalises Iran's distrust of US reversibility. Qatar holds the funds in an escrow structure agreed under the 2023 Algiers-inspired channel, but Qatar cannot release them without both US Treasury authorisation (given the original freeze was a US instrument) and Iran's formal acceptance of the transfer mechanism. The US authorisation is the sticking point: Trump's posted position is that authorisation follows Hormuz reopening, not precedes it.

What could happen next?
  • Consequence

    The sequencing deadlock means any MOU structure, however broadly agreed, cannot generate a signed Phase 1 instrument until the $12bn mechanism resolves, which requires a US Treasury authorisation Trump has not issued.

    Immediate · Assessed
  • Risk

    If Pakistan or Qatar broker a face-saving formula under which $6bn of the $12bn is released in tranches tied to Hormuz reopening milestones, Iran's Khamenei Council would need to approve a phased asset release, a domestic political hurdle with no precedent since 1981.

    Short term · Suggested
  • Precedent

    A successful Iran asset-release via Qatar, routed outside US re-freeze authority, would establish the template for sanctioned states negotiating asset releases in future conflicts.

    Long term · Suggested
First Reported In

Update #107 · Two markets, two prices on one Iran deal

Al Jazeera· 25 May 2026
Read original
Different Perspectives
Cross-border power traders
Cross-border power traders
The France-Germany day-ahead spread flipped from a EUR 17.20 German premium on 1 August to a EUR 4.15 French premium on 3 August, the same day French curtailment peaked. They cannot yet attribute the flip to curtailment alone, since a like-for-like overnight comparison shows French nuclear output rising while wind fell and demand returned on the weekday step.
EDF
EDF
River-cooling limits took 7.6 GW, 12 per cent of its fleet, offline on 3 August, the highest curtailment since the heatwave began, with an easing forecast to 4.3 GW on 4 August and 3 GW after. It manages the cut as a recurring seasonal constraint, expecting it to lift with river temperature, not repair.
Gasunie
Gasunie
TTF, the Dutch hub it operates, drifted to roughly EUR 55 to 58 per MWh across the window, staying inside its recent range through both the German spark reversal and the French curtailment. It reads a flat hub price as evidence that neither event this window carried enough weight to move the fuel leg on its own.
German gas-fired generators
German gas-fired generators
Record German solar of 18,761 MW on 2 August pushed the clean spark spread to minus 18.48 EUR/MWh, a loss-making day, before it returned to plus 16.20 on 3 August. They now price dispatch against post-solar residual load rather than wind alone, since the sign flipped inside 48 hours on unchanged fuel and carbon costs.
European Commission (DG Energy)
European Commission (DG Energy)
Its implementing-measures register logged transposition notices from only Portugal and Slovakia against Wednesday's Article 94 deadline for Directive (EU) 2024/1788, with 25 states silent. It expects the register to fill only gradually, since filing routinely lags legislating and any infringement track against non-notifying states runs on a slower clock than the deadline itself.
Spain's LNG terminal operators
Spain's LNG terminal operators
Spain's 9,145 GWh terminal inventory is the largest single stock in the EU LNG network, an option value that can reroute cargoes wherever the winter strip pays best rather than a cavern gas obligation tied to a fixed date. That flexibility matters more as Germany's cavern shortfall pushes more of the winter security question onto import infrastructure.