Skip to content
You can now search across every topic, entity and event.What's new
European Energy Markets
18JUN

Hormuz toll system carried 20 transits per day before ceasefire

1 min read
09:57UTC

Eleven flag states had paid the toll to transit by 5 April; the ceasefire ratifies the operating model.

EconomicDeveloping
Key takeaway

The toll system Iran built was already running before the ceasefire; the ceasefire just labelled it.

The 20 daily transits across 11 flag states are the operational reality the ceasefire's 'coordinated passage' clause now ratifies. Iran's permanent customs authority over the strait, legislated in late March , turned out to be the architecture both sides have now signed onto.

The recovery from near-zero transits in late March to 20/day by 5 April happened through individual bilateral toll deals, not through any US enforcement action. Trump's Truth Social formulation that the US 'will be helping with the traffic buildup in the strait of Hormuz' aligns the rhetoric with the operating reality.

Deep Analysis

In plain English

Eleven countries had already been paying Iran for permission to send ships through the Strait of Hormuz before the ceasefire was signed. Twenty ships went through per day on 5 April, compared to about 138 a day before the war. The deal Trump just signed says Iran will keep doing exactly this for two weeks.

What could happen next?
  • Precedent

    The toll system is operating practice and now codified in the ceasefire.

First Reported In

Update #62 · Two victories, two different lists

Seatrade Maritime· 8 Apr 2026
Read original
Different Perspectives
Cross-border power traders
Cross-border power traders
The France-Germany day-ahead spread flipped from a EUR 17.20 German premium on 1 August to a EUR 4.15 French premium on 3 August, the same day French curtailment peaked. They cannot yet attribute the flip to curtailment alone, since a like-for-like overnight comparison shows French nuclear output rising while wind fell and demand returned on the weekday step.
EDF
EDF
River-cooling limits took 7.6 GW, 12 per cent of its fleet, offline on 3 August, the highest curtailment since the heatwave began, with an easing forecast to 4.3 GW on 4 August and 3 GW after. It manages the cut as a recurring seasonal constraint, expecting it to lift with river temperature, not repair.
Gasunie
Gasunie
TTF, the Dutch hub it operates, drifted to roughly EUR 55 to 58 per MWh across the window, staying inside its recent range through both the German spark reversal and the French curtailment. It reads a flat hub price as evidence that neither event this window carried enough weight to move the fuel leg on its own.
German gas-fired generators
German gas-fired generators
Record German solar of 18,761 MW on 2 August pushed the clean spark spread to minus 18.48 EUR/MWh, a loss-making day, before it returned to plus 16.20 on 3 August. They now price dispatch against post-solar residual load rather than wind alone, since the sign flipped inside 48 hours on unchanged fuel and carbon costs.
European Commission (DG Energy)
European Commission (DG Energy)
Its implementing-measures register logged transposition notices from only Portugal and Slovakia against Wednesday's Article 94 deadline for Directive (EU) 2024/1788, with 25 states silent. It expects the register to fill only gradually, since filing routinely lags legislating and any infringement track against non-notifying states runs on a slower clock than the deadline itself.
Spain's LNG terminal operators
Spain's LNG terminal operators
Spain's 9,145 GWh terminal inventory is the largest single stock in the EU LNG network, an option value that can reroute cargoes wherever the winter strip pays best rather than a cavern gas obligation tied to a fixed date. That flexibility matters more as Germany's cavern shortfall pushes more of the winter security question onto import infrastructure.