Skip to content
Welcome, thoughtbot's Giant Robots listeners!Start here
Drones: Industry & Defence
26OCT

Araghchi's Hormuz approval awaits Supreme Leader

2 min read
15:07UTC

Iranian state media says eight rounds of Hormuz talks have finished and Abbas Araghchi has given the draft preliminary approval. Two higher authorities have not.

TechnologyDeveloping
Key takeaway

Araghchi's approval is preliminary; the Supreme Leader and the security council have not signed the Hormuz draft.

Iranian state media reported eight completed rounds of talks with Oman on 5 August, covering a maritime corridor, mine clearance, monitoring arrangements and possible service fees⁠1. Foreign Minister Abbas Araghchi has given the resulting draft a preliminary approval. It still needs the Supreme Leader and the Supreme National Security Council (SNSC), the body chaired by Iran's president that signs off every strategic security decision, before it binds anything⁠2.

That sequence is worth understanding before reading any Iranian statement about Hormuz. Araghchi runs the negotiation but does not own the decision; the SNSC turns an agreed text into national policy, and the Supreme Leader's office can withhold assent without ever explaining why. Tehran has run announcements ahead of substance on this file before, with Baghaei flatly denying any negotiations on 28 July while Trump claimed deep talks were under way.

The agenda list tells a reader more than the approval status does. Mine clearance appearing as a negotiating item concedes that mines were laid and that somebody must now lift them, which is engineering work with a timetable rather than a communique. Monitoring implies a party watching compliance, and the identity of that party has not been disclosed. Service fees survived eight rounds despite Washington having rejected any Iranian toll or permission requirement outright⁠3, which suggests the item was parked rather than resolved.

An unsigned draft can still fail at the last gate, and the incentives around that gate point in opposite directions. Iranian domestic politics need the arrangement to read as Iranian management of the strait; Washington needs it to read as unconditional transit. The ambiguity that allowed eight rounds to conclude is the same ambiguity that keeps the text unpublished.

Deep Analysis

In plain English

Iranian state media said negotiators have finished eight rounds of talks covering how ships would move through the strait of Hormuz, and that Iran's foreign minister has given preliminary approval to what was agreed. But in Iran's system, the country's Supreme Leader and top security council still have to sign off before anything is final, and that has not happened yet.

Deep Analysis
Root Causes

Araghchi's preliminary approval covers the negotiating text, not Iran's constitutional sign-off chain: under Iran's system, the Supreme National Security Council and ultimately the Supreme Leader hold final authority over any agreement touching sovereignty or security.

That is why eight completed rounds have not yet produced a binding deal despite the foreign ministry's approval.

What could happen next?
  • Consequence

    Preliminary ministerial approval without Supreme Leader sign-off keeps the corridor unenforceable and unpriced by insurers regardless of how many negotiating rounds have concluded.

First Reported In

Update #166 · Two Hormuz deals, neither one published

IRNA· 6 Aug 2026
Read original →
Different Perspectives
Nigerian Air Force
Nigerian Air Force
The air force listed 12 Turkish Aksungur and two Chinese CH-4D armed drones on 25 October. No contract has been published, so these are plans.
Civilians in Western Sahara
Civilians in Western Sahara
A UN report of October 2023 records allegations of Moroccan drone strikes east of the berm. An aerial strike there in November 2022 reportedly killed six civilians, the UN said, citing Polisario and local media.
Thunder Tiger
Thunder Tiger
The Taichung company said on 16 October that all 1,520 of its Gauntlet I attack drones passed inspection. Its MoU with AeroVironment covers fitting Switchblade to its uncrewed boats and ground vehicles and exploring joint production in Taiwan.
EDGE Group
EDGE Group
The Emirati group said on 9 October it will supply glide bombs and guidance kits for the Royal Moroccan Air Force's armed drones. A separate memorandum explores making small arms and aero engines in Morocco.
Rajnath Singh
Rajnath Singh
India's Defence Acquisition Council, which he chairs, approved about Rs 2.12 lakh crore of proposals on 26 October, including kamikaze drones and tank-mounted counter-drone systems. About 82 per cent of the value is to go to Indian industry, by the ministry's account.
Kongsberg
Kongsberg
The Norwegian group said on 13 October it will invest more than 200m zlotys in a Pomeranian plant to build and maintain SAN counter-drone systems. It expects series output to begin in the first half of 2028.

Written with AI from Lowdown's published reporting. Not individually reviewed by an editor. Editorial standards.