Skip to content
You can now search across every topic, entity and event.What's new
European Energy Markets
18JUN

State media leaks a deal nobody confirms

3 min read
09:57UTC

Mehr News, an Iranian state-affiliated outlet, published a 14-point version of the memorandum on 14 June listing $24 billion in frozen assets freed and $300 billion in reconstruction. No US or Iranian official confirmed it; Al Jazeera and Iran International could not verify it.

EconomicDeveloping
Key takeaway

The only published version of the deal is an unconfirmed leak from Iran's own state media.

Mehr News Agency, an Iranian state-affiliated outlet aligned with the IRGC, published a 14-point version of the memorandum on 14 June. 1 The list describes a permanent ceasefire on all fronts including Lebanon, $24 billion in frozen Iranian assets freed during the 60-day window, suspended oil sanctions, a naval blockade lifted within 30 days, and $300 billion in reconstruction, while leaving Iran's missiles and proxies out of the draft entirely. No US or Iranian official has confirmed a word of it.

The $24bn figure is not new to the negotiation. Iran's negotiator Rezaei had demanded exactly that sum in freed assets as a precondition for any deal , so the leaked draft reads less as disclosure than as Tehran restating its opening price through friendly media. To scale the numbers, $24bn is roughly half of Iran's pre-war annual oil revenue, and $300bn approaches three-quarters of its entire annual economic output.

Al Jazeera and Iran International both said they could not independently verify the Mehr list. 2 The real text stays sealed until Geneva, which leaves a maximalist state-media draft as the only published account of what the deal contains. Set that draft beside the empty US record and the distance is the point: a 14-point wish list circulating in Tehran, against a Washington that has filed nothing.

Deep Analysis

In plain English

Mehr News Agency is an Iranian news outlet closely linked to the state and to the Islamic Revolutionary Guard Corps. On 14 June, before the MOU was digitally signed, Mehr published what it claimed was the full 14-point list of what Iran had agreed to: $24 billion in frozen bank accounts freed, oil sanctions suspended, a naval blockade lifted within 30 days, and $300 billion for reconstruction. No US or Iranian official confirmed these terms. Two other news outlets, Al Jazeera and Iran International, said they could not independently verify the list. The signed MOU has not been publicly released. That gap, between what Mehr published and what the official signed document says, is the story: the deal's real terms will only become clear at the Geneva ceremony on 19 June or when a text is officially released.

First Reported In

Update #129 · Iran deal signed, but no paper to show

Iran International· 16 Jun 2026
Read original
Causes and effects
This Event
State media leaks a deal nobody confirms
The only published terms are the ones Iran's own media chose to release, set against an official US record that stands empty.
Different Perspectives
Cross-border power traders
Cross-border power traders
The France-Germany day-ahead spread flipped from a EUR 17.20 German premium on 1 August to a EUR 4.15 French premium on 3 August, the same day French curtailment peaked. They cannot yet attribute the flip to curtailment alone, since a like-for-like overnight comparison shows French nuclear output rising while wind fell and demand returned on the weekday step.
EDF
EDF
River-cooling limits took 7.6 GW, 12 per cent of its fleet, offline on 3 August, the highest curtailment since the heatwave began, with an easing forecast to 4.3 GW on 4 August and 3 GW after. It manages the cut as a recurring seasonal constraint, expecting it to lift with river temperature, not repair.
Gasunie
Gasunie
TTF, the Dutch hub it operates, drifted to roughly EUR 55 to 58 per MWh across the window, staying inside its recent range through both the German spark reversal and the French curtailment. It reads a flat hub price as evidence that neither event this window carried enough weight to move the fuel leg on its own.
German gas-fired generators
German gas-fired generators
Record German solar of 18,761 MW on 2 August pushed the clean spark spread to minus 18.48 EUR/MWh, a loss-making day, before it returned to plus 16.20 on 3 August. They now price dispatch against post-solar residual load rather than wind alone, since the sign flipped inside 48 hours on unchanged fuel and carbon costs.
European Commission (DG Energy)
European Commission (DG Energy)
Its implementing-measures register logged transposition notices from only Portugal and Slovakia against Wednesday's Article 94 deadline for Directive (EU) 2024/1788, with 25 states silent. It expects the register to fill only gradually, since filing routinely lags legislating and any infringement track against non-notifying states runs on a slower clock than the deadline itself.
Spain's LNG terminal operators
Spain's LNG terminal operators
Spain's 9,145 GWh terminal inventory is the largest single stock in the EU LNG network, an option value that can reroute cargoes wherever the winter strip pays best rather than a cavern gas obligation tied to a fixed date. That flexibility matters more as Germany's cavern shortfall pushes more of the winter security question onto import infrastructure.