BP Rotterdam restarted one 200kbd crude unit on the morning of Thursday 04 June after an unplanned outage the day before, WoodMac reported.1 The second 200kbd unit has stayed dark since its 01 May planned maintenance. BP Rotterdam is BP's 400kbd refinery feeding the Amsterdam-Rotterdam-Antwerp product hub, so its throughput moves NWE gasoil and gasoline availability directly. Effective capacity is now around 200kbd, half the 400kbd nameplate.
That is a material change from the both-units-dark, zero-throughput state through May, the outage that alongside the EU import collapse drove the gasoil crack to its late-May level. Partial recovery is marginally bearish for the crack against the full-outage position. With 200kbd still offline, the structural support under the crack stays intact.
The same-day trip and restart across 03-04 June reads as a technical wobble rather than a clean return, and the second unit has no confirmed restart date. Until that unit comes back, the NWE floor is a half-plant floor, not a recovery.
