Skip to content
Welcome, thoughtbot's Giant Robots listeners!Start here
European Tech Sovereignty
19APR

Drone Dominance Gauntlet opens 8 June

1 min read
17:00UTC

The Pentagon's Drone Dominance Phase 2 Gauntlet Stage 1 runs from Monday 8 June to Saturday 20 June at Camp Grayling, Michigan, pitting startups, FPV racers and two Ukrainian firms against a programme a heritage prime now shapes.

TechnologyDeveloping

The Pentagon Drone Dominance Phase 2 Gauntlet Stage 1 opened on Monday 8 June at Camp Grayling, Michigan, running until Saturday 20 June⁠1. The field includes FPV (first-person-view) racing veterans, two Ukrainian entrants, and the Phase 1 standouts Skycutter, which scored 99.3 out of 100, and Neros on 87.5. Phase 1 had made the programme look startup-only.

That picture changed when Northrop Grumman was selected to arm 200,000 FPV attack drones with a common payload by 2027. The Gauntlet now runs inside an architecture a heritage prime helps define, even as hobbyists and small firms supply the airframes. Britain faces the same question in parallel, with BAE Systems, Tekever and Thales drawn into the Project NYX concept-demonstrator phase.

Early preferment compounds. The same dynamic put Anduril's Lattice at the centre of US counter-drone command and control; whoever holds the interface shapes everything built to it. Whether Phase 2 lets a startup, or a Ukrainian entrant, place against that backdrop is the open test Stage 1 begins to settle when it closes on 20 June.

Deep Analysis

In plain English

The Pentagon is spending $1.1 billion to buy more than 300,000 attack drones by 2027. These are small aircraft that fly to a target and destroy themselves on impact, similar to what Ukraine and Russia have been using in the war. The Pentagon called its procurement programme Drone Dominance and is running a competitive fly-off to select suppliers. Phase 1 selected 11 vendors. Phase 2 is now underway, with Stage 1 running 8-20 June at Camp Grayling, a military training base in Michigan. Competitors include Phase 1 winner Skycutter, Phase 1 runner-up Neros, two Ukrainian firms, and FPV drone-racing specialists who have adapted their sport skills for military use. Northrop Grumman, a major traditional defence company, was separately chosen to design a standard warhead and fuze module that all the competing drones will need to carry.

First Reported In

Update #11 · Ukraine starts exporting the factory

DroneXL· 7 Jun 2026
Read original →
Different Perspectives
European Centre for International Political Economy
European Centre for International Political Economy
ECIPE found nine states gave about 97% of awarded cloud lots to home providers from 2018 to 2025, and every sovereignty-framed lot went to a domestic supplier. The think tank reads sovereignty clauses as a home-bias tool that narrows competition, with a 46% sole-bidder rate on a small sample.
Mistral AI
Mistral AI
Mistral opened a Munich industrial AI hub on 28 September with BMW and Siemens Energy work, and Germany's digital minister Karsten Wildberger praised it on the launch page. The French lab gains a German ministerial endorsement while its 21 October Nvidia partnership ties the work to US accelerators.
AWS European Sovereign Cloud
AWS European Sovereign Cloud
AWS will run its Brandenburg region for several hours on 24 October cut off from the AWS global backbone, with an EU-resident team. AWS says the test follows BSI's C3A criteria and will give regulators and customers verifiable evidence of separation.
Greenland government
Greenland government
Greenland signed a joint declaration with the EU and Denmark in September and received Virkkunen on 24 and 25 September. The Arctic Strategy now backs a cable linking Greenland directly to Europe, an alternative to Greenland Connect, which lands in Canada and Iceland.
Greek government
Greek government
Kyriakos Mitsotakis inaugurated DAEDALUS at Lavrion on 19 October, a €36m machine on Nvidia GH200 chips that anchors the PHAROS AI Factory. Athens paid 65% through Greece 2.0, making national recovery money the main funder of an EU AI Factory.
ASML
ASML
ASML reported record quarterly sales of €11.66bn and said planned supply for 2027 and 2028 will not fully meet demand. It plans about 30% more capacity in 2027, and some customers want to book for 2029 and 2030.

Written with AI from Lowdown's published reporting. Not individually reviewed by an editor. Editorial standards.