Skip to content
Welcome, thoughtbot's Giant Robots listeners!Start here
Data Centres: Boom and Backlash
15NOV

Johor halts data-centre approvals after water protest

2 min read
23:07UTC

Johor stopped approving Tier 1 and Tier 2 data centres after Malaysia's first water-rights protest at a facility; SCMP reports applicants are being told to wait for water connections until mid-2027.

IndustryDeveloping
Key takeaway

Johor's halt imports a UN human-rights framework into South East Asian data-centre regulation.

Johor, the Malaysian state hosting most of the country's data-centre investment, halted approvals for Tier 1 and Tier 2 facilities in late April 2026 after the country's first water-rights protest at a data-centre facility. The Diplomat reported the halt on 27 April, framing the underlying community challenge under the UN Guiding Principles on Business and Human Rights. SCMP reported that applicants are being told to wait for water connections until mid-2027, an effective 14-month freeze for any project not already in the pipeline.

The Diplomat's invocation of the UN framework sits at the centre of the structural change. The UN Guiding Principles on Business and Human Rights, adopted by the UN Human Rights Council in 2011, set a corporate responsibility to respect human rights including the right to water under General Comment 15. The Diplomat's invocation of the framework places Johor's halt in the same legal-conceptual category as the Milwaukee Riverkeeper action against Microsoft's Mount Pleasant campus in Wisconsin, where a water-disclosure non-disclosure clause was broken by litigation. The framework does not mandate a particular regulatory outcome; it changes the disclosure obligations and the legal vocabulary available to communities challenging individual sites.

Johor matters because of where it sits in the Asia-Pacific compute map. The state hosts data-centre investment from AirTrunk, Equinix, Bridge Data Centres, GDS, and several Singaporean and Chinese hyperscalers, drawn across the causeway by Singapore's own moratorium and by Johor's lower power costs. A 14-month water-connection freeze rebalances site selection toward Indonesia (Batam, Bintan), the Philippines, and Vietnam, all of which carry their own water-stress and grid-stability constraints. The halt is unlikely to produce a permanent freeze, given the economic-development pressure inside the Malaysian state government, but the precedent of a UN-framework community challenge surviving long enough to alter approvals is the new regional baseline.

Deep Analysis

In plain English

Johor is a Malaysian state just across the Johor Strait from Singapore. It has become popular with data centre companies because electricity is cheap and it sits next to Singapore's major internet infrastructure. Data centres use large amounts of water for cooling, especially in a hot and humid climate like Malaysia's, where the cooling systems run harder than in cooler countries. A local community held the country's first protest specifically about data centre water use, and authorities responded by pausing new data centre approvals until mid-2027, affecting both major (Tier 1) and medium-sized (Tier 2) projects. A policy journal, The Diplomat, reported the case as a human-rights issue about who has the right to access clean water when industrial users compete with local communities.

First Reported In

Update #2 · Maine veto, Seattle freeze, $725bn capex

The Diplomat· 6 May 2026
Read original →
Different Perspectives
Mooresville Board of Commissioners
Mooresville Board of Commissioners
The town board north of Charlotte voted unanimously on 2 November to stop taking data-centre applications for 12 months. Commissioners cited environmental and electrical impacts, joining other North Carolina towns that have paused new projects.
Naver
Naver
Naver signed a US$9bn contract under which a Brookfield vehicle owns the GPUs and buildings and sells computing to Naver Cloud. It guarantees the fees for up to eight years, which also unlocked Nvidia's US$1bn equity investment.
Saudi Aramco
Saudi Aramco
Aramco closed its purchase of 49% of HUMAIN on 1 November, paying about US$2.6bn in cash and adding its own AI, compute and digital assets. Chief executive Amin Nasser cast the deal as a gain in technology standing.
NEXTDC board
NEXTDC board
The board called the Goodman and Digital Realty stake opportunistic and said it had received no takeover proposal. It enters the 20 November meeting with a new chairman search, a 10% fee cut and a spill resolution on the agenda.
Brasscom
Brasscom
Sergio Sgobbi of Brazil's technology industry association says investors face uncertainty until the Redata rules are public. Members need rulings on gas and the CDE levy after Lula said data centres must build their own power.
Johari Abdul Ghani, Malaysia's investment, trade and industry minister
Johari Abdul Ghani, Malaysia's investment, trade and industry minister
He told the Dewan Rakyat in October that data centres pay for all the grid capacity they reserve and fund upgrades to TNB's network. Google's 4 November pledge repeats those terms as its own.

Written with AI from Lowdown's published reporting. Not individually reviewed by an editor. Editorial standards.