The Record
Autonomous Systems: Land & Sea
What we told you to watch, what each side claimed, and what we got wrong. Every verdict shows its evidence.
Happened 3 · Open 56 · Corrections 267
What we told you to watch
Happened · 3
Ulsan USV launch: HD Hyundai launches its Ulsan uncrewed surface vessel prototype by 31 December 2026.
From the 8 Nov briefing · Judged 27 Nov 2026
HD Hyundai and Anduril launched the 600-tonne-class ASV ALPHA at HD Hyundai Heavy Industries' Ulsan yard on 12 November, well inside the 31 December deadline (iNews24, Seoul Shinmun).
“HD Hyundai and Anduril launch uncrewed surface vessel ALPHA”
MHC Block 2 signature: DE&S signs the MHC Block 2 vehicle contract with HII Unmanned Systems by 30 November 2026, after standstill ends on 12 November.
From the 8 Nov briefing · Judged 27 Nov 2026
MoD announced on 24 November a £142m MHC Block 2 contract with HII for REMUS 620 UUVs, inside the 30 November deadline; HII confirms the award. The signed value is 47% of the £303m intended-award figure; whether that excluded the option is unstated.
“£142 million contract with HII for REMUS 620 uncrewed underwater vehicles”
Whether the MUSV marketplace at-sea demonstrations produce a selection
From the 5 Sept briefing · Judged 8 Nov 2026
The MUSV marketplace produced a selection: phase-one production awards for 30 MUSVs, ten each to Galliano, HII and Saronic, announced 29 September 2026.
“On 29 September 2026 the US Navy announced phase-one production awards for 30 medium uncrewed surface vessels (MUSVs), ten each to Galliano Marine Services, HII and Saronic Technologies”
Still open · 56
Show the 10 most recentWhether the MCA names new MASS zones or issues guidance at the 30 June Autonomy Industry Meeting, and whether the first Experience Building Phase certificates appear after 1 July.
From the 24 Jun briefing · Deadline: 30 June
Whether a binding government UGV order follows the Eurosatory cooperation agreements and MoUs.
From the 24 Jun briefing
Whether BAE Systems' Herne extra-large AUV secures Lloyd's Register certification.
From the 24 Jun briefing
Whether any UGV procurement decision is signed at Eurosatory (15-19 June) rather than only displayed.
From the 13 Jun briefing · Deadline: 19 June
Whether the MCA names further MASS trial zones or issues guidance notes at the 30 June Autonomy Industry Meeting.
From the 13 Jun briefing · Deadline: 30 June
Whether the Lyme Bay and Sirius package conducts an actual mine-clearance operation rather than continued integration training.
From the 13 Jun briefing
Whether any AUKUS Pillar II follow-on names a British hull or accepts a European bid for the platform layer.
From the 13 Jun briefing
Whether Seawork 2026 (9 to 11 June, Southampton) produces a named UK autonomous-vessel contract or capability release.
From the 6 Jun briefing · Deadline: 11 June
The MCA Workboat Code amendment expected around 1 July, when the IMO MASS Code enters force.
From the 6 Jun briefing · Deadline: 1 July
BAE Systems' Herne XLAUV reaching Lloyd's Register certification and its promised 2026 delivery.
From the 6 Jun briefing
Whether any UK-built platform enters the AUKUS Pillar II UUV workstream as the payload work matures.
From the 6 Jun briefing
The first MASS trial applications filed through the MCA's Plymouth designated zone.
From the 6 Jun briefing
Whether RFA Lyme Bay's force actually begins mine-clearance operations in or near the Strait of Hormuz, rather than holding station as deterrence.
From the 29 May briefing
Whether any flag state issues the first MASS Code remote-operator or control-centre certification once the code enters force on 1 July.
From the 29 May briefing · Deadline: 1 July
Whether a UK Ministry of Defence UGV programme of record follows the ARX-Supacat and fast-tracked experimentation contracts, or whether the work stays in trials.
From the 29 May briefing
Whether DNV and Lloyd's Register class rules or IMO national interpretations diverge during the Experience Building Phase, signalling the patchwork the code was meant to prevent.
From the 29 May briefing
What each side claimed
Claims are what a named side said at the time. We record them as said and judge them only against later evidence.
No claims recorded yet.
What we got wrong
- SignificantCorrected 8 Nov 2026We said
weapons for Type 91 and Type 93 are being developed under the AUKUS Pillar II Signature Project
What was truethe Signature Project covers payloads and enabling systems for uncrewed underwater vehicles only; the Defence Investment Plan (p.26, per Commons written question 15077) refers to weapons and sensor payloads for underwater drones under AUKUS Pillar II, which fits the Type 93 XLUUV; no source ties the Type 91 uncrewed missile platform to the project, and no Type 9x programme has passed concept and assessment
- SignificantCorrected 8 Nov 2026We said
weapons for Type 91 and Type 93 are being developed under the AUKUS Pillar II Signature Project
What was truethe Signature Project covers payloads and enabling systems for uncrewed underwater vehicles only; the Defence Investment Plan (p.26, per Commons written question 15077) refers to weapons and sensor payloads for underwater drones under AUKUS Pillar II, which fits the Type 93 XLUUV; no source ties the Type 91 uncrewed missile platform to the project, and no Type 9x programme has passed concept and assessment
- SignificantCorrected 8 Nov 2026We said
the AUKUS Pillar II Signature Project (30 May 2026) named two US-built vehicles and no British hull, setting a pattern of naming only US-built vehicles
What was truethe fact sheet covers payloads and enabling systems for each partner's own UUVs and names no vehicle, manufacturer or budget; the vehicle names came from DVIDS captions of a December 2024 AUKUS trial
- SignificantCorrected 8 Nov 2026We said
the AUKUS Pillar II Signature Project (30 May 2026) named two US-built vehicles and no British hull, setting a pattern of naming only US-built vehicles
What was truethe fact sheet covers payloads and enabling systems for each partner's own UUVs and names no vehicle, manufacturer or budget; the vehicle names came from DVIDS captions of a December 2024 AUKUS trial
- SignificantCorrected 8 Nov 2026We said
the AUKUS Pillar II Signature Project (30 May 2026) named two US-built vehicles and no British hull, setting a pattern of naming only US-built vehicles
What was truethe fact sheet covers payloads and enabling systems for each partner's own UUVs and names no vehicle, manufacturer or budget; the vehicle names came from DVIDS captions of a December 2024 AUKUS trial
- SignificantCorrected 8 Nov 2026We said
the AUKUS Pillar II Signature Project (30 May 2026) named two US-built vehicles and no British hull, setting a pattern of naming only US-built vehicles
What was truethe fact sheet covers payloads and enabling systems for each partner's own UUVs and names no vehicle, manufacturer or budget; the vehicle names came from DVIDS captions of a December 2024 AUKUS trial
- SignificantCorrected 8 Nov 2026We said
the AUKUS Pillar II Signature Project (30 May 2026) named two US-built vehicles and no British hull, setting a pattern of naming only US-built vehicles
What was truethe fact sheet covers payloads and enabling systems for each partner's own UUVs and names no vehicle, manufacturer or budget; the vehicle names came from DVIDS captions of a December 2024 AUKUS trial
- SignificantCorrected 8 Nov 2026We said
the AUKUS Pillar II Signature Project (30 May 2026) named two US-built vehicles and no British hull, setting a pattern of naming only US-built vehicles
What was truethe fact sheet covers payloads and enabling systems for each partner's own UUVs and names no vehicle, manufacturer or budget; the vehicle names came from DVIDS captions of a December 2024 AUKUS trial
- SignificantCorrected 8 Nov 2026We said
the AUKUS Pillar II Signature Project (30 May 2026) named two US-built vehicles and no British hull, setting a pattern of naming only US-built vehicles
What was truethe fact sheet covers payloads and enabling systems for each partner's own UUVs and names no vehicle, manufacturer or budget; the vehicle names came from DVIDS captions of a December 2024 AUKUS trial
- SignificantCorrected 8 Nov 2026We said
the AUKUS Pillar II Signature Project (30 May 2026) named two US-built vehicles and no British hull, setting a pattern of naming only US-built vehicles
What was truethe fact sheet covers payloads and enabling systems for each partner's own UUVs and names no vehicle, manufacturer or budget; the vehicle names came from DVIDS captions of a December 2024 AUKUS trial
- SignificantCorrected 8 Nov 2026We said
the AUKUS Pillar II Signature Project (30 May 2026) named two US-built vehicles and no British hull, setting a pattern of naming only US-built vehicles
What was truethe fact sheet covers payloads and enabling systems for each partner's own UUVs and names no vehicle, manufacturer or budget; the vehicle names came from DVIDS captions of a December 2024 AUKUS trial
- SignificantCorrected 8 Nov 2026We said
the AUKUS Pillar II Signature Project (30 May 2026) named two US-built vehicles and no British hull, setting a pattern of naming only US-built vehicles
What was truethe fact sheet covers payloads and enabling systems for each partner's own UUVs and names no vehicle, manufacturer or budget; the vehicle names came from DVIDS captions of a December 2024 AUKUS trial
- SignificantCorrected 8 Nov 2026We said
Beijing's PLA Navy Research Institute has noted that compact-submarine AUV motherships generate a distinctive acoustic signature during launch and recovery
What was trueno PLA Navy Research Institute statement on AUV mothership acoustic signatures was found; the attribution and the claim are unsourced
- SignificantCorrected 8 Nov 2026We said
Kongsberg's HUGIN family has qualified as a NATO mine-countermeasures payload on 14 separate allied programmes since 2003
What was trueno source for 14 qualifications was found; Kongsberg says the Norwegian HUGIN 1000 served in NATO exercises and the MCMFORNORTH reaction force from autumn 2004
- SignificantCorrected 8 Nov 2026We said
RUSI's Sidharth Kaushal and colleagues assess that the Signature Project separates platforms (Pillar I, the SSN-AUKUS submarine) from payloads (Pillar II)
What was trueno RUSI or Kaushal assessment of the Signature Project was found; Pillar I covers the nuclear-powered submarine programme, not UUV platforms; the payload-only scope comes from the fact sheet itself
- SignificantCorrected 8 Nov 2026We said
the named actor is the US Navy programme manager for the Signature Project, whose contract awards in the second half of 2026 decide the UK outcome
What was trueno AUKUS document names a US Navy programme manager or an award date; the fact sheet says only that delivery starts in 2027 and that each nation first develops its own payloads
- SignificantCorrected 8 Nov 2026We said
two October 2023 incidents, the BT Shetland cable cut and the Balticconnector rupture, were both attributed by Finnish and Estonian investigators to anchor drag from a vessel near Russian naval exercises, in the GIUK corridor
What was truethe SHEFA-2 cable (Faroese Telecom, not BT) was cut on 20 October 2022 and its operator blamed a fishing vessel; Balticconnector ruptured on 8 October 2023 in the Gulf of Finland and Finnish police traced it to the anchor of the Hong Kong-flagged Newnew Polar Bear; no source links either to Russian naval exercises or the GIUK gap
- SignificantCorrected 8 Nov 2026We said
Kongsberg's HISAS 1032 has 14 NATO qualifications since 2003
What was trueno source for any count of HISAS 1032 NATO qualifications was found; the figure is unsourced
- MinorCorrected 8 Nov 2026We said
the enabling-systems layer across a 100-plus-vehicle fleet over a ten-year programme could represent hundreds of millions in UK contracts
What was trueno AUKUS document or cited source gives a fleet size, programme length or value; the fact sheet names no budget
- SignificantCorrected 8 Nov 2026We said
Britain negotiated a licensed-manufacturing arrangement for Tomahawk under the 1958 Mutual Defence Agreement, with Royal Ordnance Factory involvement
What was trueBritain bought Tomahawk off the shelf: the US notified a request for 65 conventional TLAMs on 19 September 1995 and the order was placed with the US DoD (HC Deb 11 June 1996 vol 279 c87W). No licensed UK manufacture is on record; the 1958 Mutual Defence Agreement covers nuclear cooperation