The Record
Autonomous Systems: Land & Sea
What we told you to watch, what each side claimed, and what we got wrong. Every verdict shows its evidence.
Happened 3 · Open 56 · Corrections 267
What we told you to watch
Happened · 3
Ulsan USV launch: HD Hyundai launches its Ulsan uncrewed surface vessel prototype by 31 December 2026.
From the 8 Nov briefing · Judged 27 Nov 2026
HD Hyundai and Anduril launched the 600-tonne-class ASV ALPHA at HD Hyundai Heavy Industries' Ulsan yard on 12 November, well inside the 31 December deadline (iNews24, Seoul Shinmun).
“HD Hyundai and Anduril launch uncrewed surface vessel ALPHA”
MHC Block 2 signature: DE&S signs the MHC Block 2 vehicle contract with HII Unmanned Systems by 30 November 2026, after standstill ends on 12 November.
From the 8 Nov briefing · Judged 27 Nov 2026
MoD announced on 24 November a £142m MHC Block 2 contract with HII for REMUS 620 UUVs, inside the 30 November deadline; HII confirms the award. The signed value is 47% of the £303m intended-award figure; whether that excluded the option is unstated.
“£142 million contract with HII for REMUS 620 uncrewed underwater vehicles”
Whether the MUSV marketplace at-sea demonstrations produce a selection
From the 5 Sept briefing · Judged 8 Nov 2026
The MUSV marketplace produced a selection: phase-one production awards for 30 MUSVs, ten each to Galliano, HII and Saronic, announced 29 September 2026.
“On 29 September 2026 the US Navy announced phase-one production awards for 30 medium uncrewed surface vessels (MUSVs), ten each to Galliano Marine Services, HII and Saronic Technologies”
Still open · 56
Show the 10 most recentWaymo recall filings: By 31 December 2026, NHTSA's recall database lists a Waymo recall report for cars entering closed freeway lanes.
From the 27 Nov briefing · Deadline: 2026-12-31
California freeway order: By 31 January 2027, the California DMV lifts its 11 November restriction on Waymo's driverless freeway operations.
From the 27 Nov briefing · Deadline: 2027-01-31
Pony.ai year-end fleet: By 31 March 2027, Pony.ai reports a robotaxi fleet of at least 3,500 vehicles at the end of 2026.
From the 27 Nov briefing · Deadline: 2027-03-31
ASV ALPHA reaches the US: By 28 February 2027, HD Hyundai's ASV ALPHA arrives in the United States and passes to Anduril.
From the 27 Nov briefing · Deadline: 2027-02-28
Ukraine UGV growth: Ukraine's defence ministry reports a November UGV mission total above 31,398 but below 34,538 by 15 December 2026, a rise under 10%.
From the 8 Nov briefing · Deadline: 2026-12-15
Whether the US Navy publishes per-yard MUSV values or names a second production tranche that Birdon could win
From the 7 Oct briefing
When Taiwan's defence ministry sets the first annual budget line under the Act's NT$240bn six-year allocation
From the 7 Oct briefing
Whether the Spanish Navy awards the Sparus II refit after bids close on 23 October
From the 7 Oct briefing · Deadline: 23 October
Whether DNV issues Fassmer an approval in principle for an autonomous naval design
From the 7 Oct briefing
Whether Taiwan's Act is promulgated, and therefore when its six-month commencement clock starts
From the 5 Sept briefing
Whether Japan's two UUV module research lines attract a stated amount in the final FY2027 defence budget
From the 5 Sept briefing
Whether the Royal Navy's Platform Authority moves past its 5 August planning notice to a tender release
From the 5 Sept briefing · Deadline: 5 August
Whether the manufacturer of Ukraine's ARK-1 ground robot is ever named; two rounds of research have failed to reach a source.
From the 12 Aug briefing
Whether the Platform Authority tender issues on or near 20 August, and whether its scope reaches component provenance or stops at seaworthiness.
From the 12 Aug briefing · Deadline: 20 August
Whether the MoD grants the equipment audit the Conservative opposition asked for, and whether it extends past cameras.
From the 12 Aug briefing
Whether the K3 SCOUT fleet returns to the Hormuz freedom-of-navigation package or is dropped from it.
From the 12 Aug briefing
Whether MHC Block 2's offshore support vessel funding moves past the £90m seed toward the £330m three-hull estimate.
From the 12 Aug briefing
What Remora Robotics shows at Aqua Nor in Trondheim, 18 to 20 August.
From the 12 Aug briefing · Deadline: 20 August
Whether the US Navy's high-capacity Medium Uncrewed Surface Vessel request for prototype proposals (presolicitation N0003926RR001) issues, and which yards bid for it.
From the 3 Aug briefing
Whether Belgium's twelve-ROV tender names a supplier, and whether any bidder offers an untethered vehicle against a specification written for a tethered one.
From the 3 Aug briefing
What each side claimed
Claims are what a named side said at the time. We record them as said and judge them only against later evidence.
No claims recorded yet.
What we got wrong
- SignificantCorrected 8 Nov 2026We said
weapons for Type 91 and Type 93 are being developed under the AUKUS Pillar II Signature Project
What was truethe Signature Project covers payloads and enabling systems for uncrewed underwater vehicles only; the Defence Investment Plan (p.26, per Commons written question 15077) refers to weapons and sensor payloads for underwater drones under AUKUS Pillar II, which fits the Type 93 XLUUV; no source ties the Type 91 uncrewed missile platform to the project, and no Type 9x programme has passed concept and assessment
- SignificantCorrected 8 Nov 2026We said
weapons for Type 91 and Type 93 are being developed under the AUKUS Pillar II Signature Project
What was truethe Signature Project covers payloads and enabling systems for uncrewed underwater vehicles only; the Defence Investment Plan (p.26, per Commons written question 15077) refers to weapons and sensor payloads for underwater drones under AUKUS Pillar II, which fits the Type 93 XLUUV; no source ties the Type 91 uncrewed missile platform to the project, and no Type 9x programme has passed concept and assessment
- SignificantCorrected 8 Nov 2026We said
the AUKUS Pillar II Signature Project (30 May 2026) named two US-built vehicles and no British hull, setting a pattern of naming only US-built vehicles
What was truethe fact sheet covers payloads and enabling systems for each partner's own UUVs and names no vehicle, manufacturer or budget; the vehicle names came from DVIDS captions of a December 2024 AUKUS trial
- SignificantCorrected 8 Nov 2026We said
the AUKUS Pillar II Signature Project (30 May 2026) named two US-built vehicles and no British hull, setting a pattern of naming only US-built vehicles
What was truethe fact sheet covers payloads and enabling systems for each partner's own UUVs and names no vehicle, manufacturer or budget; the vehicle names came from DVIDS captions of a December 2024 AUKUS trial
- SignificantCorrected 8 Nov 2026We said
the AUKUS Pillar II Signature Project (30 May 2026) named two US-built vehicles and no British hull, setting a pattern of naming only US-built vehicles
What was truethe fact sheet covers payloads and enabling systems for each partner's own UUVs and names no vehicle, manufacturer or budget; the vehicle names came from DVIDS captions of a December 2024 AUKUS trial
- SignificantCorrected 8 Nov 2026We said
the AUKUS Pillar II Signature Project (30 May 2026) named two US-built vehicles and no British hull, setting a pattern of naming only US-built vehicles
What was truethe fact sheet covers payloads and enabling systems for each partner's own UUVs and names no vehicle, manufacturer or budget; the vehicle names came from DVIDS captions of a December 2024 AUKUS trial
- SignificantCorrected 8 Nov 2026We said
the AUKUS Pillar II Signature Project (30 May 2026) named two US-built vehicles and no British hull, setting a pattern of naming only US-built vehicles
What was truethe fact sheet covers payloads and enabling systems for each partner's own UUVs and names no vehicle, manufacturer or budget; the vehicle names came from DVIDS captions of a December 2024 AUKUS trial
- SignificantCorrected 8 Nov 2026We said
the AUKUS Pillar II Signature Project (30 May 2026) named two US-built vehicles and no British hull, setting a pattern of naming only US-built vehicles
What was truethe fact sheet covers payloads and enabling systems for each partner's own UUVs and names no vehicle, manufacturer or budget; the vehicle names came from DVIDS captions of a December 2024 AUKUS trial
- SignificantCorrected 8 Nov 2026We said
the AUKUS Pillar II Signature Project (30 May 2026) named two US-built vehicles and no British hull, setting a pattern of naming only US-built vehicles
What was truethe fact sheet covers payloads and enabling systems for each partner's own UUVs and names no vehicle, manufacturer or budget; the vehicle names came from DVIDS captions of a December 2024 AUKUS trial
- SignificantCorrected 8 Nov 2026We said
the AUKUS Pillar II Signature Project (30 May 2026) named two US-built vehicles and no British hull, setting a pattern of naming only US-built vehicles
What was truethe fact sheet covers payloads and enabling systems for each partner's own UUVs and names no vehicle, manufacturer or budget; the vehicle names came from DVIDS captions of a December 2024 AUKUS trial
- SignificantCorrected 8 Nov 2026We said
the AUKUS Pillar II Signature Project (30 May 2026) named two US-built vehicles and no British hull, setting a pattern of naming only US-built vehicles
What was truethe fact sheet covers payloads and enabling systems for each partner's own UUVs and names no vehicle, manufacturer or budget; the vehicle names came from DVIDS captions of a December 2024 AUKUS trial
- SignificantCorrected 8 Nov 2026We said
the AUKUS Pillar II Signature Project (30 May 2026) named two US-built vehicles and no British hull, setting a pattern of naming only US-built vehicles
What was truethe fact sheet covers payloads and enabling systems for each partner's own UUVs and names no vehicle, manufacturer or budget; the vehicle names came from DVIDS captions of a December 2024 AUKUS trial
- SignificantCorrected 8 Nov 2026We said
Beijing's PLA Navy Research Institute has noted that compact-submarine AUV motherships generate a distinctive acoustic signature during launch and recovery
What was trueno PLA Navy Research Institute statement on AUV mothership acoustic signatures was found; the attribution and the claim are unsourced
- SignificantCorrected 8 Nov 2026We said
Kongsberg's HUGIN family has qualified as a NATO mine-countermeasures payload on 14 separate allied programmes since 2003
What was trueno source for 14 qualifications was found; Kongsberg says the Norwegian HUGIN 1000 served in NATO exercises and the MCMFORNORTH reaction force from autumn 2004
- SignificantCorrected 8 Nov 2026We said
RUSI's Sidharth Kaushal and colleagues assess that the Signature Project separates platforms (Pillar I, the SSN-AUKUS submarine) from payloads (Pillar II)
What was trueno RUSI or Kaushal assessment of the Signature Project was found; Pillar I covers the nuclear-powered submarine programme, not UUV platforms; the payload-only scope comes from the fact sheet itself
- SignificantCorrected 8 Nov 2026We said
the named actor is the US Navy programme manager for the Signature Project, whose contract awards in the second half of 2026 decide the UK outcome
What was trueno AUKUS document names a US Navy programme manager or an award date; the fact sheet says only that delivery starts in 2027 and that each nation first develops its own payloads
- SignificantCorrected 8 Nov 2026We said
two October 2023 incidents, the BT Shetland cable cut and the Balticconnector rupture, were both attributed by Finnish and Estonian investigators to anchor drag from a vessel near Russian naval exercises, in the GIUK corridor
What was truethe SHEFA-2 cable (Faroese Telecom, not BT) was cut on 20 October 2022 and its operator blamed a fishing vessel; Balticconnector ruptured on 8 October 2023 in the Gulf of Finland and Finnish police traced it to the anchor of the Hong Kong-flagged Newnew Polar Bear; no source links either to Russian naval exercises or the GIUK gap
- SignificantCorrected 8 Nov 2026We said
Kongsberg's HISAS 1032 has 14 NATO qualifications since 2003
What was trueno source for any count of HISAS 1032 NATO qualifications was found; the figure is unsourced
- MinorCorrected 8 Nov 2026We said
the enabling-systems layer across a 100-plus-vehicle fleet over a ten-year programme could represent hundreds of millions in UK contracts
What was trueno AUKUS document or cited source gives a fleet size, programme length or value; the fact sheet names no budget
- SignificantCorrected 8 Nov 2026We said
Britain negotiated a licensed-manufacturing arrangement for Tomahawk under the 1958 Mutual Defence Agreement, with Royal Ordnance Factory involvement
What was trueBritain bought Tomahawk off the shelf: the US notified a request for 65 conventional TLAMs on 19 September 1995 and the order was placed with the US DoD (HC Deb 11 June 1996 vol 279 c87W). No licensed UK manufacture is on record; the 1958 Mutual Defence Agreement covers nuclear cooperation