Skip to content
Welcome, thoughtbot's Giant Robots listeners!Start here

The Record

Autonomous Systems: Land & Sea

What we told you to watch, what each side claimed, and what we got wrong. Every verdict shows its evidence.

Happened 3 · Open 56 · Corrections 267

What we told you to watch

Happened · 3

  • Ulsan USV launch: HD Hyundai launches its Ulsan uncrewed surface vessel prototype by 31 December 2026.

    From the 8 Nov briefing · Judged 27 Nov 2026

    HD Hyundai and Anduril launched the 600-tonne-class ASV ALPHA at HD Hyundai Heavy Industries' Ulsan yard on 12 November, well inside the 31 December deadline (iNews24, Seoul Shinmun).

    • “HD Hyundai and Anduril launch uncrewed surface vessel ALPHA”

      ObservedSupportsinews24.com
  • MHC Block 2 signature: DE&S signs the MHC Block 2 vehicle contract with HII Unmanned Systems by 30 November 2026, after standstill ends on 12 November.

    From the 8 Nov briefing · Judged 27 Nov 2026

    MoD announced on 24 November a £142m MHC Block 2 contract with HII for REMUS 620 UUVs, inside the 30 November deadline; HII confirms the award. The signed value is 47% of the £303m intended-award figure; whether that excluded the option is unstated.

    • “£142 million contract with HII for REMUS 620 uncrewed underwater vehicles”

      AssertedSupportsgov.uk
  • Whether the MUSV marketplace at-sea demonstrations produce a selection

    From the 5 Sept briefing · Judged 8 Nov 2026

    The MUSV marketplace produced a selection: phase-one production awards for 30 MUSVs, ten each to Galliano, HII and Saronic, announced 29 September 2026.

    • “On 29 September 2026 the US Navy announced phase-one production awards for 30 medium uncrewed surface vessels (MUSVs), ten each to Galliano Marine Services, HII and Saronic Technologies”

Still open · 56

Show the 10 most recent
  • Whether the MCA names new MASS zones or issues guidance at the 30 June Autonomy Industry Meeting, and whether the first Experience Building Phase certificates appear after 1 July.

    From the 24 Jun briefing · Deadline: 30 June

  • Whether a binding government UGV order follows the Eurosatory cooperation agreements and MoUs.

    From the 24 Jun briefing

  • Whether BAE Systems' Herne extra-large AUV secures Lloyd's Register certification.

    From the 24 Jun briefing

  • Whether any UGV procurement decision is signed at Eurosatory (15-19 June) rather than only displayed.

    From the 13 Jun briefing · Deadline: 19 June

  • Whether the MCA names further MASS trial zones or issues guidance notes at the 30 June Autonomy Industry Meeting.

    From the 13 Jun briefing · Deadline: 30 June

  • Whether the Lyme Bay and Sirius package conducts an actual mine-clearance operation rather than continued integration training.

    From the 13 Jun briefing

  • Whether any AUKUS Pillar II follow-on names a British hull or accepts a European bid for the platform layer.

    From the 13 Jun briefing

  • Whether Seawork 2026 (9 to 11 June, Southampton) produces a named UK autonomous-vessel contract or capability release.

    From the 6 Jun briefing · Deadline: 11 June

  • The MCA Workboat Code amendment expected around 1 July, when the IMO MASS Code enters force.

    From the 6 Jun briefing · Deadline: 1 July

  • BAE Systems' Herne XLAUV reaching Lloyd's Register certification and its promised 2026 delivery.

    From the 6 Jun briefing

  • Whether any UK-built platform enters the AUKUS Pillar II UUV workstream as the payload work matures.

    From the 6 Jun briefing

  • The first MASS trial applications filed through the MCA's Plymouth designated zone.

    From the 6 Jun briefing

  • Whether RFA Lyme Bay's force actually begins mine-clearance operations in or near the Strait of Hormuz, rather than holding station as deterrence.

    From the 29 May briefing

  • Whether any flag state issues the first MASS Code remote-operator or control-centre certification once the code enters force on 1 July.

    From the 29 May briefing · Deadline: 1 July

  • Whether a UK Ministry of Defence UGV programme of record follows the ARX-Supacat and fast-tracked experimentation contracts, or whether the work stays in trials.

    From the 29 May briefing

  • Whether DNV and Lloyd's Register class rules or IMO national interpretations diverge during the Experience Building Phase, signalling the patchwork the code was meant to prevent.

    From the 29 May briefing

What each side claimed

Claims are what a named side said at the time. We record them as said and judge them only against later evidence.

No claims recorded yet.

What we got wrong

Show the 10 most recent
  • SignificantCorrected 27 Nov 2026
    We said

    Britain signed the REMUS 620 contract for £142m.

    What was true

    The MoD announced £142m; the signed contract's own notice records £303m excluding VAT.

  • SignificantCorrected 27 Nov 2026
    We said

    The US Navy Lionfish order was larger than Britain's contract.

    What was true

    The comparison rested on £142m; the UK contract notice records £303m excluding VAT, so "larger" was unsupported.

  • SignificantCorrected 27 Nov 2026
    We said

    The signed REMUS 620 contract was £142m, under half (47%) of the £303m named on 3 November.

    What was true

    DE&S's notice of the signed contract records £303m excluding VAT, the same as the 3 November figure. The MoD announced £142m; neither source explains the difference.

  • SignificantCorrected 27 Nov 2026
    We said

    Britain signed the REMUS 620 contract for £142m.

    What was true

    The MoD announced £142m; the signed contract's own notice records £303m excluding VAT.

  • SignificantCorrected 27 Nov 2026
    We said

    Britain signed the REMUS 620 contract for £142m.

    What was true

    The MoD announced £142m; the signed contract's own notice records £303m excluding VAT.

  • SignificantCorrected 27 Nov 2026
    We said

    Britain signed the REMUS 620 contract for £142m.

    What was true

    The MoD announced £142m; the signed contract's own notice records £303m excluding VAT.

  • SignificantCorrected 27 Nov 2026
    We said

    The signed REMUS 620 contract was £142m, under half (47%) of the £303m named on 3 November.

    What was true

    DE&S's notice of the signed contract records £303m excluding VAT, the same as the 3 November figure. The MoD announced £142m; neither source explains the difference.

  • MinorCorrected 27 Nov 2026
    We said

    three P1118 motherships confirmed for 2031

    What was true

    The first is due in 2031, with an option for three more

  • MinorCorrected 27 Nov 2026
    We said

    Waymo filed two NHTSA recalls

    What was true

    Waymo said it would file two recalls

  • MinorCorrected 27 Nov 2026
    We said

    Heading said Washington widens the exemption route

    What was true

    NHTSA prepared exemption paperwork; nothing was widened

  • MinorCorrected 27 Nov 2026
    We said

    Waymo halts freeway rides after California hazard order

    What was true

    Same fact, shorter title so the search result does not truncate

  • MinorCorrected 27 Nov 2026
    We said

    Shane Arnett

    What was true

    Shane Arnott, Anduril senior vice president

  • MinorCorrected 27 Nov 2026
    We said

    Shane Arnett

    What was true

    Shane Arnott, Anduril senior vice president

    In HD Hyundai and Anduril launch ASV ALPHA

  • MinorCorrected 27 Nov 2026
    We said

    Shane Arnett

    What was true

    Shane Arnott, Anduril senior vice president

    In HD Hyundai and Anduril launch ASV ALPHA

  • MinorCorrected 8 Nov 2026
    We said

    internal process notes published in the body

    What was true

    notes not for readers

  • MinorCorrected 8 Nov 2026
    We said

    internal process notes published in the body

    What was true

    notes not for readers

  • SignificantCorrected 8 Nov 2026
    We said

    weapons for Type 91 and Type 93 are being developed under the AUKUS Pillar II Signature Project

    What was true

    the Signature Project covers payloads and enabling systems for uncrewed underwater vehicles only; the Defence Investment Plan (p.26, per Commons written question 15077) refers to weapons and sensor payloads for underwater drones under AUKUS Pillar II, which fits the Type 93 XLUUV; no source ties the Type 91 uncrewed missile platform to the project, and no Type 9x programme has passed concept and assessment

  • SignificantCorrected 8 Nov 2026
    We said

    weapons for Type 91 and Type 93 are being developed under the AUKUS Pillar II Signature Project

    What was true

    the Signature Project covers payloads and enabling systems for uncrewed underwater vehicles only; the Defence Investment Plan (p.26, per Commons written question 15077) refers to weapons and sensor payloads for underwater drones under AUKUS Pillar II, which fits the Type 93 XLUUV; no source ties the Type 91 uncrewed missile platform to the project, and no Type 9x programme has passed concept and assessment

  • SignificantCorrected 8 Nov 2026
    We said

    weapons for Type 91 and Type 93 are being developed under the AUKUS Pillar II Signature Project

    What was true

    the Signature Project covers payloads and enabling systems for uncrewed underwater vehicles only; the Defence Investment Plan (p.26, per Commons written question 15077) refers to weapons and sensor payloads for underwater drones under AUKUS Pillar II, which fits the Type 93 XLUUV; no source ties the Type 91 uncrewed missile platform to the project, and no Type 9x programme has passed concept and assessment

  • SignificantCorrected 8 Nov 2026
    We said

    weapons for Type 91 and Type 93 are being developed under the AUKUS Pillar II Signature Project

    What was true

    the Signature Project covers payloads and enabling systems for uncrewed underwater vehicles only; the Defence Investment Plan (p.26, per Commons written question 15077) refers to weapons and sensor payloads for underwater drones under AUKUS Pillar II, which fits the Type 93 XLUUV; no source ties the Type 91 uncrewed missile platform to the project, and no Type 9x programme has passed concept and assessment