Skip to content
You can now search across every topic, entity and event.What's new
Autonomous Systems: Land & Sea
12AUG

Gauntlet II confirmed for August 2026

1 min read
14:17UTC

The next competitive drone trial will test 50,000 to 60,000 drones against live electronic warfare. Vendors that fail the red team get eliminated.

TechnologyDeveloping
Key takeaway

Gauntlet II will eliminate drone vendors whose systems cannot survive electronic warfare.

The Pentagon confirmed Gauntlet II for August 2026 at an undisclosed location described as "brutally hot."1 The exercise will target procurement of 50,000 to 60,000 additional drones, with JIATF-401 running a live counter-UAS red team using GPS jamming, communications denial, and electronic warfare.

Phase I delivered 30,000 one-way attack drones from 11 vendors at roughly $5,000 per unit . Phase II raises the stakes: drones that cannot survive contested electromagnetic environments will be eliminated from the programme. The total target remains 300,000 or more drones by 2027 under a $1.1 billion budget . Two additional Gauntlets are planned beyond Phase II. Skycutter's 99.3/100 Gauntlet I score will mean nothing if its design cannot withstand active jamming.

Deep Analysis

In plain English

In August the Pentagon will hold a competition where it attacks participating drones with GPS jamming and communications disruption while trying to shoot them down with counter-drone systems. Drones that survive this electronic warfare gauntlet will be selected for bulk orders of 50,000 to 60,000 units. Drones that fail simply leave the programme. This is a significant escalation from Phase I, which tested basic performance. Phase II tests whether drones can actually operate in war conditions. Skycutter won Phase I with a near-perfect score, but that test did not include active electronic warfare.

What could happen next?
  • Consequence

    Gauntlet II's EW survivability requirement will eliminate a significant proportion of Phase I qualifiers, concentrating procurement among a smaller number of technically advanced vendors.

    Short term · High
  • Opportunity

    Vendors that pass Gauntlet II gain preferred supplier status for up to 300,000 drones, representing a multi-year contract pipeline worth hundreds of millions.

    Medium term · High
  • Precedent

    The Gauntlet model, using live adversarial testing to down-select vendors, will become the standard for all US military drone procurement and will be adopted by allied nations.

    Long term · Medium
First Reported In

Update #3 · Anduril wins $20 billion counter-drone deal

The Telegraph· 30 Mar 2026
Read original
Different Perspectives
Conservative opposition
Conservative opposition
The Conservative opposition called on the Government on 9 August to 'urgently audit' equipment for hidden Chinese components, after the Telegraph's K3 SCOUT report. No named MP has been quoted on the record; the call came at party level, alongside the Ministry of Defence's own 10 August statement that no data had been compromised.
Netherlands Ministry of Defence
Netherlands Ministry of Defence
The Netherlands Ministry of Defence authorised Dutch Naval Design on 4 August to design 12-metre anti-submarine warfare uncrewed vessels for the Dutch-Belgian frigate programme, and to buy an adapted Compact FLASH dipping sonar from Thales Underwater Systems France. The order commits money and a named supplier while Britain's own certification body remains at the market-engagement stage.
Kraken Technology Group
Kraken Technology Group
Kraken Technology Group is a UK maritime-defence company based in Portsmouth that builds the K3 SCOUT, and crossed a $1bn valuation in July on a single-sourced $175m raise. The camera components reached the fleet under a third party's written security assurance, which the Platform Authority, which does not yet exist, was never positioned to check.
Navy Commercial
Navy Commercial
Navy Commercial at Whale Island published two notices on 5 August: 074032-2026, asking industry how to build a Platform Authority to certify uncrewed vessels, and 074351-2026, a GBP10m multi-role USV testbed for the Defence Chief Technology Officer. Responses on the Platform Authority close 19 August, ten days after the cameras were found transmitting to China.
Ministry of Defence
Ministry of Defence
The Ministry of Defence said on 10 August that a routine cyber vulnerability assessment found the camera fault, and a thorough investigation found no evidence that MoD data or systems had been accessed, compromised or transmitted externally. It stripped the cameras of internet connectivity but did not say whether it acted against the supplier.
Thales
Thales
Thales converted its 6 July engaging accord with Exail into a definitive combination agreement on 30-31 July, but the tender offer for Exail's remaining shares now closes by early 2028, later than July's timetable implied. Thales integrates its new undersea prime while still bidding against Kongsberg and DRASS's 2027 target for the AUKUS Pillar II contest.