Skip to content
You can now search across every topic, entity and event.What's new
European Energy Markets
3AUG

Trump's Pickaxe threat, but no order

1 min read
10:53UTC

Donald Trump said the US would be hitting Pickaxe Mountain very soon and heavily, though no CENTCOM release, deployment or force-posture change names the site.

EconomicDeveloping
Key takeaway

Trump named Pickaxe Mountain as a target in words only; no order or deployment follows the threat.

Donald Trump said the United States would be "hitting that area very probably pretty soon, very heavily", referring to Pickaxe Mountain, the tunnel complex near Natanz 1. No CENTCOM (US Central Command) release, deployment order or force-posture change names the site.

Trump committed words, not an order. The recent US strike waves have hit maritime, missile and drone storage and coastal-surveillance targets, most lately Ahvaz and a Khuzestan water station on an eighth night of bombing , not the mountain, and the fresh reinforcement of jets and tankers points at the coast and the Gulf rather than the interior. Pickaxe Mountain, known to Iranians as Kuh-e Kolang Gaz La, is a deep tunnel complex that Israeli intelligence assesses now holds moved nuclear material, which is what lifts a presidential aside about striking it above routine bluster. On the substance, though, Trump has committed only rhetoric, and the measurable posture is aimed elsewhere.

Deep Analysis

In plain English

President Trump said the US would soon be 'hitting that area very probably pretty soon, very heavily,' referring to Pickaxe Mountain, a site in Iran linked to its nuclear programme. But no US military order, deployment announcement or official release has actually named Pickaxe Mountain as a target. This matters because Trump has a track record in this war of making strong public statements that are not always followed by an actual military order. The clearer signal to watch is troop and aircraft movements, not what he says at a podium.

Deep Analysis
Root Causes

Trump's preference for public declaration over signed orders predates this specific threat. OFAC recorded zero new Iran, IRGC or Hezbollah sanctions instruments for a full week in early July even as he told reporters he would 'finish the job' militarily, signing nothing alongside the line.

The measurable US action in this period is the separate jet and refueller reinforcement into the region, not the Pickaxe threat itself. Force posture, not rhetoric, has been the reliable indicator of what Washington is actually preparing to do.

Escalation

Trump's rhetoric has repeatedly run ahead of any signed military order in this war, so the measurable escalation risk sits with the separate jet and refueller reinforcement, not with this statement alone.

What could happen next?
  • Risk

    Treating Trump's Pickaxe Mountain line as an imminent operational fact, rather than rhetoric unmatched by any signed order, would overstate the immediate strike risk based on this war's pattern so far.

First Reported In

Update #160 · Houthis hit Saudi tankers; Brent tops $100

The Jerusalem Post· 23 Jul 2026
Read original
Causes and effects
Different Perspectives
Cross-border power traders
Cross-border power traders
The France-Germany day-ahead spread flipped from a EUR 17.20 German premium on 1 August to a EUR 4.15 French premium on 3 August, the same day French curtailment peaked. They cannot yet attribute the flip to curtailment alone, since a like-for-like overnight comparison shows French nuclear output rising while wind fell and demand returned on the weekday step.
EDF
EDF
River-cooling limits took 7.6 GW, 12 per cent of its fleet, offline on 3 August, the highest curtailment since the heatwave began, with an easing forecast to 4.3 GW on 4 August and 3 GW after. It manages the cut as a recurring seasonal constraint, expecting it to lift with river temperature, not repair.
Gasunie
Gasunie
TTF, the Dutch hub it operates, drifted to roughly EUR 55 to 58 per MWh across the window, staying inside its recent range through both the German spark reversal and the French curtailment. It reads a flat hub price as evidence that neither event this window carried enough weight to move the fuel leg on its own.
German gas-fired generators
German gas-fired generators
Record German solar of 18,761 MW on 2 August pushed the clean spark spread to minus 18.48 EUR/MWh, a loss-making day, before it returned to plus 16.20 on 3 August. They now price dispatch against post-solar residual load rather than wind alone, since the sign flipped inside 48 hours on unchanged fuel and carbon costs.
European Commission (DG Energy)
European Commission (DG Energy)
Its implementing-measures register logged transposition notices from only Portugal and Slovakia against Wednesday's Article 94 deadline for Directive (EU) 2024/1788, with 25 states silent. It expects the register to fill only gradually, since filing routinely lags legislating and any infringement track against non-notifying states runs on a slower clock than the deadline itself.
Spain's LNG terminal operators
Spain's LNG terminal operators
Spain's 9,145 GWh terminal inventory is the largest single stock in the EU LNG network, an option value that can reroute cargoes wherever the winter strip pays best rather than a cavern gas obligation tied to a fixed date. That flexibility matters more as Germany's cavern shortfall pushes more of the winter security question onto import infrastructure.