Skip to content
Briefings are running a touch slower this week while we rebuild the foundations.See roadmap
European Energy Markets
8JUN

Germany net-withdrew 459 GWh on 13 April

3 min read
12:01UTC

Four days into the injection season the EU's largest storage estate is still drawing down, not refilling.

EconomicDeveloping
Key takeaway

Germany is still emptying, not filling, and cannot accelerate its way out later.

Bundesnetzagentur-fed AGSI+ data shows Germany recorded a net gas storage withdrawal of 459 GWh on the 13 April gas day, leaving national storage at 23.27%, fractionally below the 23.32% posted on 12 April 1. Four days into what should have flipped to sustained injection, the country's cavern network was still running a net draw.

German injection capacity is fixed at 4,274 GWh/day against 7,047 GWh/day of withdrawal; the asymmetry means the pipelines can empty the caverns faster than they can fill them. A late start is not recoverable by acceleration, only by running closer to the injection ceiling for longer, which leaves no headroom for the next supply shock.

The EU aggregate is still on pace against the reduced November target , but it is running on periphery injection while the anchor drifts. Bruegel's refill estimate assumed Germany at net-injection by mid-April; that assumption has not held.

For winter-26 gas portfolios, this is the only domestic data point on the calendar that matters as much as the Hormuz ceasefire call ; it is also the only one that cannot be hedged with a headline.

Deep Analysis

In plain English

Gas storage works like a giant underground tank that Europe fills during summer when demand is low, then draws down during winter when heating demand is high. By early April the heating season should be winding down and the refilling should have started. Germany has the biggest gas storage network in the EU, so its behaviour sets the pace for the whole bloc. On 13 April it was still drawing gas out (459 GWh net), not putting it in, even though the storage season officially began on 1 April. That is a problem because Germany's filling equipment can only push gas in so fast. A late start cannot be made up by filling faster later. The tank is already unusually empty at 23.27%, about half the level it would be at this time in a normal year.

Deep Analysis
Root Causes

Germany's storage deficit has two structural causes distinct from the current Hormuz crisis. First, the Nord Stream pipeline destruction in September 2022 removed roughly 55 bcm per year of German-destined capacity, forcing Germany onto spot LNG and Norwegian pipeline at premium prices and preventing the pre-winter fill rates achievable before 2022.

Second, Germany's cavern storage geology (predominantly salt caverns with fast-cycle capability) means its working gas volumes are disproportionately small relative to its consumption. France and Italy hold a higher share of depleted-field storage with larger working volumes; Germany's estate is sized for rapid response, not strategic reserve depth.

What could happen next?
  • Risk

    If Germany remains in net withdrawal through late April, EU aggregate storage will miss the trajectory required for 80% by November, even with the target reduced from 90% (ID:2355).

  • Consequence

    Industrial demand curtailment orders in Germany, the EU's largest manufacturing economy, would amplify Cefic's reported 37Mt capacity loss by depressing output further in chemicals, steel, and glass.

First Reported In

Update #2 · TTF EUR 42 as Russian LNG ban enters range

Gas Infrastructure Europe· 15 Apr 2026
Read original
Different Perspectives
Hungary and Slovakia (Central European supply-security bloc)
Hungary and Slovakia (Central European supply-security bloc)
Nine days from the 17 June short-term pipeline ban, neither Hungary's February CJEU challenge nor Slovakia's signalled application has produced a stay; the legal route has not bought the supply-protection time it was intended to. After 17 June, Hungary's long-term Gazprom-TurkStream contract to 2036 becomes the sole remaining Russian pipeline import route for both states.
LNG spot traders and cargo routers
LNG spot traders and cargo routers
Monday's EUR 50.83 TTF close narrows the JKM-TTF arb from USD 1.225/MMBtu toward USD 0.75/MMBtu on a sustained basis, which is the threshold at which Atlantic spot cargoes compete on equal terms with Asian demand. The next weekly laycan window is the operative data point; at USD 1.225 the arb still points Asia but only barely.
EU institutions (European Commission, ACER)
EU institutions (European Commission, ACER)
ACER's 11 June REMIT workshop and the 12 June guidance lock signal the surveillance regime is entering its first full enforcement cycle under expanded cross-border powers, with 204 suspicious-transaction reports in 2025 already doubling the prior year before the new powers activated. The Article 207 TFEU pipeline ban framing has produced no CJEU stay, validating the trade-measure classification strategy.
EDF and French nuclear-anchored buyers
EDF and French nuclear-anchored buyers
The EUR 96.20 record spread flows directly to French industrials via the CRE's VNU mechanism, delivering near the EUR 28 day-ahead print at the factory gate. The advantage reverses from September when Flamanville-3's overhaul removes 1.6 GW; the spread will compress mechanically as heating-season demand rises and French surplus narrows.
German industrial buyers and capacity planners
German industrial buyers and capacity planners
The cabinet-approved StromVKG is a direct acknowledgement that EUR 124/MWh day-ahead power and a EUR -8 spark spread make Germany's grid unfinanceable on market terms alone; the 2031 first-capacity date is five years of exposure before relief arrives. At EUR 96 below French factory-gate power prices, the competitiveness gap is real and widening.
TTF traders / Amsterdam hub desks
TTF traders / Amsterdam hub desks
TTF broke its 38-session EUR 46-47 band on 2 June to EUR 48.9 on stalled Iran diplomacy and an unconfirmed Troll A restart; Dutch EBN mandates carry storage trajectory while commercial injection books nothing. The 17 June pipeline expiry is the next binary level: Central European hub premium above EUR 2/MWh widens sharply on any physical step-down.