Skip to content
You can now search across every topic, entity and event.What's new
European Energy Markets
3AUG

Khamenei absent 32 days — longest ever

1 min read
10:53UTC

No video, no audio, no appearance. The longest gap for any Supreme Leader since 1979, and the CIA cannot confirm his condition.

EconomicDeveloping
Key takeaway

Iran is fighting its largest war without a visible commander-in-chief.

Mojtaba Khamenei, Iran's Supreme Leader, last communicated on 12 March through a written statement read by a state TV anchor. 1 No video or audio has surfaced in the 32 days since, the longest public absence for any Supreme Leader in the republic's history. The CIA is actively searching for proof of his condition .

By comparison, Ayatollah Ruhollah Khomeini's longest absence during the Iran-Iraq War was nine days. The silence spans the war's most consequential period: ground forces converging on the Gulf, a cluster warhead deployed for the first time, and two bills (toll legislation, NPT withdrawal) awaiting a parliament that has not convened in 31 days.

Deep Analysis

In plain English

Iran has a Supreme Leader, currently Mojtaba Khamenei, who holds ultimate authority over war and peace decisions. He has not appeared in public, on video, or on audio for 32 days. His last communication was a written statement read by a news anchor on 12 March. This is the longest disappearance for any Supreme Leader since the Iranian Republic was founded in 1979. By comparison, the previous Supreme Leader vanished for at most nine days during the Iran-Iraq War in the 1980s. The practical effect is that Iran's most consequential war in decades is being prosecuted without visible supreme command. The IRGC, the military-political organisation that runs Iran's armed forces, appears to be making decisions without authorisation from above.

First Reported In

Update #53 · Trump drops Hormuz goal; toll becomes law

Axios· 31 Mar 2026
Read original
Different Perspectives
Cross-border power traders
Cross-border power traders
The France-Germany day-ahead spread flipped from a EUR 17.20 German premium on 1 August to a EUR 4.15 French premium on 3 August, the same day French curtailment peaked. They cannot yet attribute the flip to curtailment alone, since a like-for-like overnight comparison shows French nuclear output rising while wind fell and demand returned on the weekday step.
EDF
EDF
River-cooling limits took 7.6 GW, 12 per cent of its fleet, offline on 3 August, the highest curtailment since the heatwave began, with an easing forecast to 4.3 GW on 4 August and 3 GW after. It manages the cut as a recurring seasonal constraint, expecting it to lift with river temperature, not repair.
Gasunie
Gasunie
TTF, the Dutch hub it operates, drifted to roughly EUR 55 to 58 per MWh across the window, staying inside its recent range through both the German spark reversal and the French curtailment. It reads a flat hub price as evidence that neither event this window carried enough weight to move the fuel leg on its own.
German gas-fired generators
German gas-fired generators
Record German solar of 18,761 MW on 2 August pushed the clean spark spread to minus 18.48 EUR/MWh, a loss-making day, before it returned to plus 16.20 on 3 August. They now price dispatch against post-solar residual load rather than wind alone, since the sign flipped inside 48 hours on unchanged fuel and carbon costs.
European Commission (DG Energy)
European Commission (DG Energy)
Its implementing-measures register logged transposition notices from only Portugal and Slovakia against Wednesday's Article 94 deadline for Directive (EU) 2024/1788, with 25 states silent. It expects the register to fill only gradually, since filing routinely lags legislating and any infringement track against non-notifying states runs on a slower clock than the deadline itself.
Spain's LNG terminal operators
Spain's LNG terminal operators
Spain's 9,145 GWh terminal inventory is the largest single stock in the EU LNG network, an option value that can reroute cargoes wherever the winter strip pays best rather than a cavern gas obligation tied to a fixed date. That flexibility matters more as Germany's cavern shortfall pushes more of the winter security question onto import infrastructure.