Skip to content
You can now search across every topic, entity and event.What's new
European Energy Markets
27JUL

REMIT 2.0 T+10 lands; STORs double

3 min read
09:24UTC

The first REMIT 2.0 T+10 transaction reporting deadline landed on Tuesday 12 May; ACER's enforcement report showed 204 Suspicious Transaction Reports filed by national regulators in 2025, double the 2024 figure.

EconomicDeveloping
Key takeaway

REMIT 2.0's T+10 deadline lands with STORs already doubled and guidance still open to revision until 12 June.

The first REMIT 2.0 (Regulation on Wholesale Energy Market Integrity and Transparency) T+10 transaction reporting deadline landed on Tuesday 12 May 2026, the first compliance gate under the recast framework that entered force 29 April . ACER's enforcement report, published Friday 8 May, showed 204 STORs (Suspicious Transaction and Order Reports) filed by national regulators in 2025, double the 2024 figure. ACER called for 'targeted improvements in surveillance by trading intermediaries', PPATs (persons professionally arranging transactions).

The compliance paradox flagged on entry day is now operative across the trading-intermediary stack: market participants must comply from 29 April with rules whose guidance remains open to formal revision until 12 June . The 204 STORs were generated under the prior REMIT framework; the doubling is a structural indicator, not a temporary surge. The T+10 deadline multiplies the data flow into NRA (national regulatory authority) systems without expanding NRA staffing, and REMIT 2.0's enhanced scope will push STOR volumes materially higher before that staffing can respond. No first-week enforcement action has surfaced through 18 May; the guidance consultation runs to 12 June.

Deep Analysis

In plain English

Europe has new rules requiring energy trading firms to report suspicious trades to regulators within ten days. The first deadline under these rules was 12 May. The regulator also published a report showing that suspicious trade reports doubled last year. Energy companies now have to submit more data, more quickly, to national watchdogs who are already stretched handling the volume from the old rules.

Deep Analysis
Root Causes

The European Parliament's decision in 2023 to recast REMIT rather than amend it required a full new notification framework, which had to enter force with a statutory timeline that did not allow ACER to finalise all implementing technical standards before the first compliance deadline.

The doubling of STORs from 2024 to 2025 under REMIT 1.0 already indicated that NRA surveillance capacity was not scaling proportionally to market activity; REMIT 2.0's expanded transaction reporting will multiply data flow without an equivalent expansion of national regulator processing capacity.

What could happen next?
  • Meaning

    The first ACER REMIT 2.0 enforcement action will establish the effective fine tariff across jurisdictions; energy desks in member states with lower domestic fine ceilings face a competitive advantage relative to London or Amsterdam-based desks under UK or Dutch national frameworks.

    Short term · Assessed
  • Meaning

    National regulator capacity constraints, identified implicitly in ACER's 'targeted improvements' call, suggest that the tripling of data volume under REMIT 2.0 will create a surveillance backlog that delays enforcement actions beyond the six-month post-T+10 window.

    Short term · Assessed
  • Meaning

    PPATs that fail to meet the T+10 deadline in the first month will not face immediate enforcement action based on ACER's opening posture, but that window of leniency is unlikely to extend past the 12 June guidance consultation close.

    Short term · Assessed
First Reported In

Update #10 · TTF breaks EUR 50; US LNG hits 58% of imports

ACER· 18 May 2026
Read original
Different Perspectives
Slovakia
Slovakia
Slovakia says it dropped its hold-out on the 21st sanctions package only after Ursula von der Leyen personally signed written gas-price and supply guarantees. The Council of the European Union's own 17,238-character release on the package names neither Slovakia nor any guarantee, leaving Bratislava's account unconfirmed by the institutional record.
EU regulator on capacity mechanisms
EU regulator on capacity mechanisms
Brussels is watching Germany's StromVKG first 4.5 GW capacity auction move toward its 8 September bid deadline without a resolved state-aid clearance for the 9 GW 2026 programme's gas-plant subsidies. A negative spark spread this deep on cheap gas strengthens the case for subsidised dispatchable capacity, the same case still awaiting a state-aid ruling.
French power exporters
French power exporters
French day-ahead cleared EUR 41.13/MWh on Sunday 26 July, EUR 43.09 below Germany, on wind more than doubling and a demand trough, not on any nuclear recovery. The desk expects the discount to hold only as long as French wind and weekend demand repeat, not as a durable nuclear-cost advantage.
European gas storage operator
European gas storage operator
A storage operator stopped bidding for prompt TTF cargoes on 21 July, reading the strike-halt unwind as the start of a fuel-side correction rather than a floor. It expects the gap between prompt and forward gas to keep narrowing as the war premium continues leaving the curve.
German gas-fired power fleet
German gas-fired power fleet
German gas-fired plants cut output from 4.37 GW to 2.85 GW between 24 and 27 July, even as TTF fell 8 per cent, because below roughly minus EUR 40/MWh the fuel price stopped deciding dispatch. The fleet expects no relief until wind eases or StromVKG's first 4.5 GW auction adds capacity.
French industrial power consumers
French industrial power consumers
France's day-ahead discount to Germany has nearly closed as TTF and EUA rise together on both sides of the border, eroding the arbitrage French industry relied on through the summer. A standing negative spark removes the German demand buffer that kept that spread wide.