Timeline
Equinor
Norwegian state-majority oil and gas company; dominant supplier of gas to Europe.
21 of 21 entries (20 events, 1 interactions)
Filters
#1329 May
extended Troll A outage to 31 May with additional 16.2 mcm/day layer
European Energy Markets: Troll A extended to 31 May; 51 mcm/day worst case#1226 May
Extended Troll partial outage to 31 May following Troll A compressor failure after 21 May annual test
European Energy Markets: Troll fault pulls Norwegian gas offline#1226 May
Mentioned in: TTF confirms EUR 50 as a ceiling
European Energy Markets#1119 May
Signed 5-year gas supply deal with Eneco for LichtBlick delivery and announced Aker BP NCS partnership
European Energy Markets: Equinor locks in five-year retail strip#99 May
Mentioned in: BASF flags Verbund freezes; Q1 EBITDA -6%
European Energy Markets#85 May
Published Q1 2026 results on 6 May without issuing Hammerfest LNG return-date guidance
European Energy Markets: Equinor Q1 closes; Hammerfest silence held#95 May
Signed NOK 17 billion in drilling contracts and started Eirin field routing first gas into Gassled
European Energy Markets: Equinor NOK 17bn drilling; Eirin first gas#84 May
Brought Eirin gas field into production on 5 May 2026
European Energy Markets: Eirin field starts; 27.6 mmboe to Gassled#74 May
Signed NOK 17bn drilling extensions on 4 May and published Q1 safety results on 30 April without Hammerfest guidance
European Energy Markets: Equinor signs NOK 17bn drilling, Hammerfest silent#71 May
Mentioned in: Sodir prints second monthly Norwegian decline
European Energy Markets#628 Apr
Mentioned in: EU storage 32%, refill pace below target
European Energy Markets#526 Apr
Published no 2026 Hammerfest return confirmation between 22 and 26 April
European Energy Markets: [RETRACTED] Equinor silent on Hammerfest as 10 July looms#526 Apr
Mentioned in: BBL halved, IUK drops in October: GB-Continent link cut
European Energy Markets#322 Apr
Shut Hammerfest LNG for planned maintenance from 22 April to 10 July 2026
European Energy Markets: [RETRACTED] Equinor shuts Hammerfest LNG from 22 April#422 Apr
Shut Hammerfest LNG for planned maintenance on 22 April with a 10 July scheduled return
European Energy Markets: [RETRACTED] Hammerfest LNG shuts for 80-day planned maintenance#422 Apr
Mentioned in: TTF closes at EUR 42.39 after Hormuz swing
European Energy Markets#321 Apr
#317 Apr
Mentioned in: TTF trades EUR 41.67 intraday, extending six-week low
European Energy Markets#310 Apr
Mentioned in: Final pre-conflict Qatari LNG tanker docks UK
European Energy Markets#31 Apr
Mentioned in: IEA logs Hormuz LNG loss at 2 bcm weekly
European Energy Markets#11 Mar