Skip to content
Briefings are running a touch slower this week while we rebuild the foundations.See roadmap
European Energy Markets
17APR

Madrid Forum 29-30 April is the post-REMIT venue

3 min read
12:44UTC

The 40th Madrid Gas Regulatory Forum runs Wednesday 29 April and Thursday 30 April, the first organised industry venue after the REMIT recast enters force on 29 April and after the Russian LNG ban entry.

EconomicDeveloping
Key takeaway

Madrid Forum on 29-30 April is the first industry venue post-REMIT recast and post-Russian LNG ban entry.

The 40th Madrid Gas Regulatory Forum runs on Wednesday 29 April and Thursday 30 April in Madrid, the first organised industry venue after the REMIT (Regulation on Wholesale Energy Market Integrity and Transparency) recast enters force on 29 April and after the Russian LNG ban entry 1. the Commission's Gas and Biomethane Mechanism launch is on the agenda alongside a REMIT 2.0 compliance afternoon.

Madrid Forum is the EU's standing tripartite venue for gas regulation, convening DG Energy, national regulators, and industry twice a year; its conclusions feed directly into Commission guidance and ACER monitoring scope. Baker McKenzie and KOR Financial have separately flagged a transition period on most REMIT II provisions 2, which would soften the simultaneity paradox ACER confirmed earlier this month without a waiver: contracts dated 28 April fall under the old one-month reporting window, identical contracts on 29 April fall under the new 14-day window, with no grace period between them.

Whether industry can secure transitional relief in Madrid is the trade-floor question of the week. The public consultation on the REMIT transaction reporting guideline opened on 16 April and runs to 12 June, meaning market participants must comply from 29 April against guidance still open to formal revision; a transition-period reading from Madrid would buy reporting desks the seven-week window before the consultation closes. The Gas and Biomethane Mechanism launch is the parallel catalyst: it is the first concrete instrument the Commission has produced since AccelerateEU for procurement-side biomethane integration, and its scope determines whether 2026 storage policy gains a price-formation channel beyond TTF spot.

Deep Analysis

In plain English

The Madrid Gas Regulatory Forum is a twice-yearly meeting between the European Commission, national energy regulators, and gas market participants. The 40th edition on 29-30 April is unusually significant because two major regulatory changes took effect on the same day: the new REMIT II market surveillance rules entered force on 29 April, and the Commission plans to launch its Gas and Biomethane Mechanism at the forum. REMIT II is an EU regulation designed to prevent manipulation in wholesale energy markets. A compliance problem has arisen: contracts signed on 28 April fall under the old reporting rules (one month to report), while identical contracts signed on 29 April fall under the new rules (14 days to report). Baker McKenzie and KOR Financial have both said there may be a transition period that softens this sharp cut-over, but ACER (the EU energy regulator) confirmed on 22 April that there is no general waiver.

What could happen next?
  • Consequence

    If ACER signals enforcement forbearance at Madrid Forum rather than issuing a formal waiver, market participants face a retrospective compliance liability window between 29 April and the 12 June consultation close, creating legal uncertainty for every gas trade in that period.

  • Opportunity

    The Gas and Biomethane Mechanism launch at Madrid Forum is the first post-Cyprus venue where storage coordination language could be given regulatory form, potentially as a voluntary injection target or a conditional mandatory trigger.

First Reported In

Update #5 · Ban day muted; Germany doubles injection rate

European Commission DG Energy· 26 Apr 2026
Read original
Causes and effects
This Event
Madrid Forum 29-30 April is the post-REMIT venue
Madrid is where industry will probe whether the REMIT II transition language Baker McKenzie and KOR Financial flagged reaches the 12 June consultation horizon and softens the simultaneity paradox ACER confirmed without a waiver.
Different Perspectives
Amsterdam-Rotterdam-Antwerp gas trading desks
Amsterdam-Rotterdam-Antwerp gas trading desks
TTF failing to sustain EUR 47-plus with 51 mcm/day of Norwegian supply offline confirms EUR 50 as a diplomatic ceiling rather than a physical floor; the curve is priced as a Troll-restart long, not a storage-deficit short. Winter Cal-26 long versus summer TTF short is the structural position FNB Gas's broken-mechanism verdict supports.
European Commission and DG Energy
European Commission and DG Energy
The Commission lowered the mandatory fill target from 90% to 80% and published the 11 May ETS benchmark revision saving industry EUR 4 billion, choosing industrial competitiveness over storage ambition at the moment physical injection margins narrowed. Berlin's confirmation of no summer injection scheme came with no Commission counter-instrument.
Hungarian and Slovak industrial offtakers
Hungarian and Slovak industrial offtakers
Hungary and Slovakia pay a EUR 2-plus delivered-gas premium over TTF benchmark prices regardless of ACER's improved pipeline-congestion reading, and both are litigating the 17 June EU pipeline ban at the CJEU (ID:3229). A post-17 June tightening of TurkStream supply would widen that basis further.
EBN and Dutch state
EBN and Dutch state
The Dutch state trebled EBN's mandate from 25 to 80 TWh, leaving EBN the sole active Dutch injector after the January auctions drew zero commercial bookings (ID:3637). The EUR 233m state budget cap is the binding cost ceiling; above-market injection at EBN is a fiscal transfer, not a market outcome.
CRE and French gas operators
CRE and French gas operators
France's 100% mandatory CRE booking order is carrying French injection regardless of the inverted strip, providing EU aggregate cover that Germany's abolished levy cannot supply. The order renews annually on CRE decision, making it a political risk rather than a structural guarantee.
FNB Gas and German TSOs
FNB Gas and German TSOs
FNB Gas formally declared the market-based storage-refill framework broken on 27 May, citing zero-clearing January auctions, ten days after Berlin ruled out any summer injection scheme. The intervention sets the institutional predicate for reintroducing a storage levy; the Gasspeicherumlage precedent (2022-25) confirms the administrative path is open.