Skip to content
Welcome, thoughtbot's Giant Robots listeners!Start here
European Energy Markets
22JUN

Australia puts sea mines in Ghost Shark

2 min read
13:56UTC

Ghost Shark can now carry up to twelve sea mines, launch Altius attack drones and drop supply caches, Australia disclosed.

EconomicDeveloping
Key takeaway

Ghost Shark gained mine, drone and supply payloads that Australia now pitches for export.

The Australian Department of Defence disclosed on 19 October that Ghost Shark, the extra-large autonomous submarine built with Anduril, can carry up to twelve sea mines at a time⁠1. Two other previously classified payloads were revealed alongside it: Anduril's Altius aerial drones, launched from the vehicle, and supply caches for special forces. An Altius can scout, or carry about 4kg of explosives against a vessel.

"Those Ghost Sharks now have teeth," said Pat Conroy, the defence industry minister. He named payloads as Australia's export focus under AUKUS Pillar Two, the strand of the Australia-UK-US pact covering shared advanced technology rather than nuclear submarines. Conroy said he "hasn't given up hope" that Britain and the US take an interest in the vehicle itself. The first boat arrived in January this year under an A$1.7bn (about £873m) contract, and Defence says "dozens and dozens" will follow.

Uncrewed minelaying has a recent precedent: a MARLIN uncrewed vessel laid a MALAMAN training mine in August. Ghost Sharks also sailed in the Maritime Big Play exercise off San Diego.

Deep Analysis

In plain English

Ghost Shark is a large robot submarine bought by Australia's Department of Defence. It travels underwater for long periods with no crew aboard. Until now Australia kept secret what it would carry. The government has now said it can lay sea mines, launch small flying drones that can spy or attack boats, and drop supplies for special forces. AUKUS is the defence pact between Australia, Britain and the US, and Australia hopes its partners will buy these add-on systems.

Deep Analysis
Root Causes

An extra-large robot submarine needs a reason to exist beyond reconnaissance, which smaller and cheaper vehicles already do. Mines, launched aerial drones and supply caches each use the one thing Ghost Shark has that small vehicles lack: internal volume and long range.

Export policy shapes the payload focus too. A whole vehicle invites partner navies to build their own, while a payload with a standard interface can ride on many allied hulls, giving Australian industry a market without needing allies to buy Australian submarines.

What could happen next?
  • Consequence

    Ghost Shark moves from a surveillance vehicle to an armed one in Australian planning.

  • Opportunity

    Australian payload makers could win AUKUS export orders if US or UK vehicles adopt compatible interfaces.

First Reported In

Update #14 · UK names HII at £303m; its tender said £125m

ABC News· 8 Nov 2026
Read original →
Causes and effects
This Event
Australia puts sea mines in Ghost Shark
Australia is pitching Ghost Shark's payloads, as well as the vehicle itself, as its AUKUS export offer.
Different Perspectives
Cross-border power traders
Cross-border power traders
The France-Germany day-ahead spread flipped from a EUR 17.20 German premium on 1 August to a EUR 4.15 French premium on 3 August, the same day French curtailment peaked. They cannot yet attribute the flip to curtailment alone, since a like-for-like overnight comparison shows French nuclear output rising while wind fell and demand returned on the weekday step.
EDF
EDF
River-cooling limits took 7.6 GW, 12 per cent of its fleet, offline on 3 August, the highest curtailment since the heatwave began, with an easing forecast to 4.3 GW on 4 August and 3 GW after. It manages the cut as a recurring seasonal constraint, expecting it to lift with river temperature, not repair.
Gasunie
Gasunie
TTF, the Dutch hub it operates, drifted to roughly EUR 55 to 58 per MWh across the window, staying inside its recent range through both the German spark reversal and the French curtailment. It reads a flat hub price as evidence that neither event this window carried enough weight to move the fuel leg on its own.
German gas-fired generators
German gas-fired generators
Record German solar of 18,761 MW on 2 August pushed the clean spark spread to minus 18.48 EUR/MWh, a loss-making day, before it returned to plus 16.20 on 3 August. They now price dispatch against post-solar residual load rather than wind alone, since the sign flipped inside 48 hours on unchanged fuel and carbon costs.
European Commission (DG Energy)
European Commission (DG Energy)
Its implementing-measures register logged transposition notices from only Portugal and Slovakia against Wednesday's Article 94 deadline for Directive (EU) 2024/1788, with 25 states silent. It expects the register to fill only gradually, since filing routinely lags legislating and any infringement track against non-notifying states runs on a slower clock than the deadline itself.
Spain's LNG terminal operators
Spain's LNG terminal operators
Spain's 9,145 GWh terminal inventory is the largest single stock in the EU LNG network, an option value that can reroute cargoes wherever the winter strip pays best rather than a cavern gas obligation tied to a fixed date. That flexibility matters more as Germany's cavern shortfall pushes more of the winter security question onto import infrastructure.

Written with AI from Lowdown's published reporting. Not individually reviewed by an editor. Editorial standards.