Skip to content
Welcome, thoughtbot's Giant Robots listeners!Start here
European Energy Markets
22JUN

Gauntlet II confirmed for August 2026

1 min read
13:56UTC

The next competitive drone trial will test 50,000 to 60,000 drones against live electronic warfare. Vendors that fail the red team get eliminated.

EconomicDeveloping
Key takeaway

Gauntlet II will eliminate drone vendors whose systems cannot survive electronic warfare.

The Pentagon confirmed Gauntlet II for August 2026 at an undisclosed location described as "brutally hot."⁠1 The exercise will target procurement of 50,000 to 60,000 additional drones, with JIATF-401 running a live counter-UAS red team using GPS jamming, communications denial, and electronic warfare.

Phase I delivered 30,000 one-way attack drones from 11 vendors at roughly $5,000 per unit. Phase II raises the stakes: drones that cannot survive contested electromagnetic environments will be eliminated from the programme. The total target remains 300,000 or more drones by 2027 under a $1.1 billion budget. Two additional Gauntlets are planned beyond Phase II. Skycutter's 99.3/100 Gauntlet I score will mean nothing if its design cannot withstand active jamming.

Deep Analysis

In plain English

In August the Pentagon will hold a competition where it attacks participating drones with GPS jamming and communications disruption while trying to shoot them down with counter-drone systems. Drones that survive this electronic warfare gauntlet will be selected for bulk orders of 50,000 to 60,000 units. Drones that fail simply leave the programme. This is a significant escalation from Phase I, which tested basic performance. Phase II tests whether drones can actually operate in war conditions. Skycutter won Phase I with a near-perfect score, but that test did not include active electronic warfare.

What could happen next?
  • Consequence

    Gauntlet II's EW survivability requirement will eliminate a significant proportion of Phase I qualifiers, concentrating procurement among a smaller number of technically advanced vendors.

    Short term · High
  • Opportunity

    Vendors that pass Gauntlet II gain preferred supplier status for up to 300,000 drones, representing a multi-year contract pipeline worth hundreds of millions.

    Medium term · High
  • Precedent

    The Gauntlet model, using live adversarial testing to down-select vendors, will become the standard for all US military drone procurement and will be adopted by allied nations.

    Long term · Medium
First Reported In

Update #3 · Anduril wins $20 billion counter-drone deal

Breaking Defense· 30 Mar 2026
Read original →
Different Perspectives
Cross-border power traders
Cross-border power traders
The France-Germany day-ahead spread flipped from a EUR 17.20 German premium on 1 August to a EUR 4.15 French premium on 3 August, the same day French curtailment peaked. They cannot yet attribute the flip to curtailment alone, since a like-for-like overnight comparison shows French nuclear output rising while wind fell and demand returned on the weekday step.
EDF
EDF
River-cooling limits took 7.6 GW, 12 per cent of its fleet, offline on 3 August, the highest curtailment since the heatwave began, with an easing forecast to 4.3 GW on 4 August and 3 GW after. It manages the cut as a recurring seasonal constraint, expecting it to lift with river temperature, not repair.
Gasunie
Gasunie
TTF, the Dutch hub it operates, drifted to roughly EUR 55 to 58 per MWh across the window, staying inside its recent range through both the German spark reversal and the French curtailment. It reads a flat hub price as evidence that neither event this window carried enough weight to move the fuel leg on its own.
German gas-fired generators
German gas-fired generators
Record German solar of 18,761 MW on 2 August pushed the clean spark spread to minus 18.48 EUR/MWh, a loss-making day, before it returned to plus 16.20 on 3 August. They now price dispatch against post-solar residual load rather than wind alone, since the sign flipped inside 48 hours on unchanged fuel and carbon costs.
European Commission (DG Energy)
European Commission (DG Energy)
Its implementing-measures register logged transposition notices from only Portugal and Slovakia against Wednesday's Article 94 deadline for Directive (EU) 2024/1788, with 25 states silent. It expects the register to fill only gradually, since filing routinely lags legislating and any infringement track against non-notifying states runs on a slower clock than the deadline itself.
Spain's LNG terminal operators
Spain's LNG terminal operators
Spain's 9,145 GWh terminal inventory is the largest single stock in the EU LNG network, an option value that can reroute cargoes wherever the winter strip pays best rather than a cavern gas obligation tied to a fixed date. That flexibility matters more as Germany's cavern shortfall pushes more of the winter security question onto import infrastructure.

Written with AI from Lowdown's published reporting. Not individually reviewed by an editor. Editorial standards.