Skip to content
Briefings are running a touch slower this week while we rebuild the foundations.See roadmap
Timeline

Pressure Control Assembly

Orion cabin pressure regulator that leaked during Artemis II; requires redesign before Artemis III.

5 of 5 entries (3 events, 2 interactions)

Filters
#1115 Apr
AnalysedOOrion
requires resolution on
Artemis II Moon Mission · source event
#1011 Apr

Leaked during mission and was committed for necessary changes without timeline

Artemis II Moon Mission: Three Orion reworks named in one call
#1010 Apr
Launched byNNASA
flagged for redesign
Artemis II Moon Mission · source event