Skip to content
Welcome, thoughtbot's Giant Robots listeners!Start here
Timeline

fault-ride-through

Grid-code procedure requiring large loads to stay connected through a brief transmission voltage dip instead of tripping to backup power.

2 of 2 entries (2 events, 0 interactions)

Filters
#12 29 Jul

Ireland writes the grid rules into contracts

Data Centres: Boom and Backlash
#10 29 Jun