Skip to content
You can now search across every topic, entity and event.What's new
European Energy Markets
4MAY

REMIT 2.0 T+10 lands; STORs double

3 min read
13:52UTC

The first REMIT 2.0 T+10 transaction reporting deadline landed on Tuesday 12 May; ACER's enforcement report showed 204 Suspicious Transaction Reports filed by national regulators in 2025, double the 2024 figure.

EconomicDeveloping
Key takeaway

REMIT 2.0's T+10 deadline lands with STORs already doubled and guidance still open to revision until 12 June.

The first REMIT 2.0 (Regulation on Wholesale Energy Market Integrity and Transparency) T+10 transaction reporting deadline landed on Tuesday 12 May 2026, the first compliance gate under the recast framework that entered force 29 April . ACER's enforcement report, published Friday 8 May, showed 204 STORs (Suspicious Transaction and Order Reports) filed by national regulators in 2025, double the 2024 figure. ACER called for 'targeted improvements in surveillance by trading intermediaries', PPATs (persons professionally arranging transactions).

The compliance paradox flagged on entry day is now operative across the trading-intermediary stack: market participants must comply from 29 April with rules whose guidance remains open to formal revision until 12 June . The 204 STORs were generated under the prior REMIT framework; the doubling is a structural indicator, not a temporary surge. The T+10 deadline multiplies the data flow into NRA (national regulatory authority) systems without expanding NRA staffing, and REMIT 2.0's enhanced scope will push STOR volumes materially higher before that staffing can respond. No first-week enforcement action has surfaced through 18 May; the guidance consultation runs to 12 June.

Deep Analysis

In plain English

Europe has new rules requiring energy trading firms to report suspicious trades to regulators within ten days. The first deadline under these rules was 12 May. The regulator also published a report showing that suspicious trade reports doubled last year. Energy companies now have to submit more data, more quickly, to national watchdogs who are already stretched handling the volume from the old rules.

Deep Analysis
Root Causes

The European Parliament's decision in 2023 to recast REMIT rather than amend it required a full new notification framework, which had to enter force with a statutory timeline that did not allow ACER to finalise all implementing technical standards before the first compliance deadline.

The doubling of STORs from 2024 to 2025 under REMIT 1.0 already indicated that NRA surveillance capacity was not scaling proportionally to market activity; REMIT 2.0's expanded transaction reporting will multiply data flow without an equivalent expansion of national regulator processing capacity.

What could happen next?
  • Meaning

    The first ACER REMIT 2.0 enforcement action will establish the effective fine tariff across jurisdictions; energy desks in member states with lower domestic fine ceilings face a competitive advantage relative to London or Amsterdam-based desks under UK or Dutch national frameworks.

    Short term · Assessed
  • Meaning

    National regulator capacity constraints, identified implicitly in ACER's 'targeted improvements' call, suggest that the tripling of data volume under REMIT 2.0 will create a surveillance backlog that delays enforcement actions beyond the six-month post-T+10 window.

    Short term · Assessed
  • Meaning

    PPATs that fail to meet the T+10 deadline in the first month will not face immediate enforcement action based on ACER's opening posture, but that window of leniency is unlikely to extend past the 12 June guidance consultation close.

    Short term · Assessed
First Reported In

Update #10 · TTF breaks EUR 50; US LNG hits 58% of imports

ACER· 18 May 2026
Read original
Different Perspectives
EU carbon and storage regulators
EU carbon and storage regulators
EUA carbon broke EUR 81/tonne on 13 July as the ETS Market Stability Reserve's scheduled withdrawals met fresh fuel-switching demand from France's nuclear curtailment. Brussels' mandatory storage-fill rule kept German and French injection running regardless of the TTF swings, the mechanism working as designed four years after the 2022 shock.
Equinor
Equinor
Equinor returned its Asgard field from maintenance on 11 July, lifting Gassco's exit nominations to 319.8 mcm/day just as TTF round-tripped on Hormuz risk. The restart gave Norway spare pipeline capacity to help Europe absorb the gas rally without drawing down storage, reinforcing its role as the post-2022 swing supplier.
Germany
Germany
Germany briefly became the cheaper leg of the FR-DE spread on 12 July as French reactors went offline, while its own storage injection tripled to 723 GWh on 11 July under the EU's mandatory fill rule. Berlin's CCGT fleet absorbed the extra load at a time when EUA's climb past EUR 81 is raising its own marginal cost too.
EDF
EDF
EDF took Chooz, Golfech and Bugey fully offline on 12 July under river-cooling discharge limits, then secured a temperature exemption for Bugey to 20 July rather than wait for the rivers to cool. The government's willingness to relax the environmental ceiling shows French grid security now outweighs the permit breach when reactor hardware itself is undamaged.
Storage and injection-pace desk
Storage and injection-pace desk
EU storage sat at 51.1% on 8 July, still running below the pace needed for an 80% November target, and the JKM-TTF Asia premium of roughly USD 1.4-2.4/MMBtu was already pulling marginal cargoes east before Qatar's withdrawal compounded the gap. October's top-up remains the binding constraint, not this week's price level.
EDF / France
EDF / France
EDF added Chooz to its heat-curtailment watch list as a precaution against the second heat dome peaking 9-14 July, alongside standing warnings at Blayais, Bugey, Golfech and Saint-Alban. No output cut has been confirmed at any site as of 10 July.