Timeline
Bergermeer
Netherlands' largest gas storage cavern; 4.5 bcm capacity, state-backed injection underpinning TTF pricing.
6 of 6 entries (6 events, 0 interactions)
Filters
#12 24 May
Mentioned in: Netherlands fills at 13.9% on EBN alone
European Energy Markets#7 4 May
Bergermeer carries Dutch injection load alone
European Energy Markets#6 28 Apr
Held only 15 TWh of its 46 TWh capacity at end-January 2026
European Energy Markets: EU storage 32%, refill pace below target#5 26 Apr
Mentioned in: BBL halved, IUK drops in October: GB-Continent link cut
European Energy Markets#5 25 Apr
Targeted for EUR 233m state-backed injection campaign in 2026
European Energy Markets: Netherlands at 8.95%, with state-backed buyer behind it#5 24 Apr